[1] 王伟平. EPC总承包模式下应用工程量清单招投标的探讨[J]. 电力建设, 2005, 1, [WANG Wei-ping, Preliminary discussion about application of bill of quantities for tender offer and bidding in EPC mode[J]. Electric Power Construction, 2005, 1.] [2] 王峰, 贾伟智, 陈洪蛟, 吴云凤. 土建工程国际招标的评标程序及方法[J]. 水利水电工程设计, 1999, 3: 43–44. [WANG Feng, JIA Wei-zhi, CHEN Hong-jiao WU Yun-feng. Civil engineering international tender evaluation procedures and methods[J]. Design of Water Resources & Hydroelectric Engineering, 1999, 3, 43–44. ] [3] 郑岩, 周栩. 铁路工程总承包的现状与对策分析[J]. 铁路采购与物流, 2007, 6, [ZHENG Yan, ZHOU Xu, An analysis on and solutions to the problems in railway project[J]. Railway Purchase and Logistics, 2007, 6.] [4] 王建军; EPC总承包方式几个相关问题的探讨[J]; 工程建设与设计; 2005, 1: 80–82. [WANG Jian-jun, The problem studies of EPC method[J]. Construction & Design for Project, 2005, 1, 80–82. ] [5] 孟宪海, 次仁顿珠, 赵启. EPC总承包模式与传统模式之比较[J]; 国际经济合作; 2004, 11: 50–51. [MENG Xian-hai, CI Rendun-zhu, ZHAO Qi. A comparative study on EPC contracting model and traditional one[J]. International Economic Cooperation, 2004,11:50–51. |