[1] LAU H Y K, ZHAO Y. Integrated scheduling of handling equipment at automated container terminals[J]. Int. J. Production Economics, 2008, 112(1): 665-682.
[2] CHEN L, BOSTEL N, DEJAX P, et al. A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal[J]. European Journal of Operational Research, 2007, 181 (1): 40-58.
[3] 钱继锋, 朱晓宁, 谢霞.“岸桥—集卡—堆场”双向作业协同模型[J]. 交通运输系统工程与信息, 2014, 14(2): 138-143. [QIAN J F, ZHU X N, XIE X. “Quays, trailers and yard” two way operations plan coordinated model[J]. Journal of Transportation Systems Engineering and Information Technology, 2014, 14(2): 138-143.]
[4] NARGES K, NATHAN H. Integrated quay crane and yard truck scheduling for unloading inbound containers[J]. Int. J. Production Economics, 2015, 159 (1): 168-177.
[5] 常祎妹, 朱晓宁, 闫柏丞. 集装箱码头铁水联运装卸设备协同调度[J]. 交通运输系统工程与信息, 2017, 17 (4): 40-47. [CHANG Y M, ZHU X N, YAN B C. Integrated scheduling of handling operations in container terminal under rail- water intermodal transportation[J]. Journal of Transportation Systems Engineering and Information Technology, 2017, 17(4): 40-47.]
[6] SHA M, ZHANG T, LAN Y, et al. Scheduling optimization of yard cranes with minimal energy consumption at container terminals[J]. Computers & Industrial Engineering, 2017(113): 704-713.
[7] HE J L. Berth allocation and quay crane assignment in a container terminal for the trade- off between timesaving and energy- saving[J]. Advanced Engineering Informatics, 2016, 30(3): 390-405. |