[1] 中国城市轨道交通协会. 城市轨道交通2021年度统计与分析报告[R]. 北京: 中国城市轨道交通协会, 2022. [China Association of Metros. Urban rail transit 2021 statistical and analysis report[R]. Beijing: China Association of Metros, 2022.]
[2] 张雄. 地铁车辆段大架修移位作业工艺设计研究[J]. 铁道工程学报, 2016, 33(10): 122-128. [ZHANG X. Research on the flow process workshop design of car overhaul and heavy repair works in metro depots[J]. Journal of Railway Engineering Society, 2016, 33(10): 122-128.]
[3] 刘葛辉, 陈绍宽, 刘爽, 等. 资源约束下城市轨道交通基础设施维修任务安排优化模型[J]. 交通运输系统工程与信息, 2021, 21(3): 163-169. [LIU G H, CHEN S K, LIU S, et al. Maintenance arrangement optimization for infrastructure systems of urban rail transit considering resource constraints[J]. Journal of Transportation Systems Engineering and Information Technology, 2021, 21(3): 163-169.]
[4] BRUCKER P, SCHLIE R. Job-shop scheduling with multi-purpose machines[J]. Computing, 1990, 45(4): 369-375.
[5] GAO K Z, CAO Z, ZHANG L, et al. A review on swarm intelligence and evolutionary algorithms for solving flexible job shop scheduling problems[J]. IEEE/CAA Journal of Automatica Sinica, 2019, 6(4): 904-916.
[6] YANG Q, LIU J, HUANG Y P, et al. The dynamic 4S auto maintenance shop scheduling in a multi-constraint machine environment based on the theory of constraints [J]. The International Journal of Advanced Manufacturing Technology, 2016, 83(9/12): 1773-1785.
[7] KOLEN A W J, KROON L G. An analysis of shift class design problems[J]. European Journal of Operational Research, 1994, 79(3): 417-430.
[8] AN Y J, CHEN X H, ZHANG J, et al. A hybrid multiobjective evolutionary algorithm to integrate optimization of the production scheduling and imperfect cutting tool maintenance considering total energy consumption[J]. Journal of Cleaner Production, 2020, 268: 121540.
[9] WANG X Z, WANG B, ZHANG X X, et al. Twoobjective robust job-shop scheduling with two problemspecific neighborhood structures[J]. Swarm and Evolutionary Computation, 2021, 61: 100805.
[10] ALEJANDRO V S, AHMED A, MOHAMMED F B. Mathematical modeling and a hybridized bacterial foraging optimization algorithm for the flexible job-shop scheduling problem with sequencing flexibility[J]. Journal of Manufacturing Systems, 2020, 54: 74-93.
[11] REN W B, WEN J Q, YAN Y, et al. Multi-objective optimization for energy-aware flexible job-shop scheduling problem with assembly operations[J]. International Journal of Production Research, 2021, 59 (23): 7216-7231.
[12] YAN J, LIU Z F, ZHANG C X, et al. Research on flexible job shop scheduling under finite transportation conditions for digital twin workshop[J]. Robotics and Computer-Integrated Manufacturing, 2021, 72: 102198.
|