Journal of Transportation Systems Engineering and Information Technology ›› 2012, Vol. 12 ›› Issue (5): 191-197.

• Cases Analysis • Previous Articles    

Key Indicators of Transportation State “863 Project” Performance Evaluations

HUANG Ling   

  1. Ministry of Science and Technology of High Technology Research and Development Center, Beijing 100044, China
  • Received:2012-04-16 Revised:2012-06-27 Online:2012-10-25 Published:2012-11-28

交通领域863计划项目考核指标与评价探讨

黄玲*   

  1. 科技部 高技术研究发展中心,北京 100044
  • 作者简介:黄玲(1970-),女,山西太原人,工程师.

Abstract:

Since the 11thFive  year Plan, Chinese government has launched State Hitech R&D (863) projects for, which aims to improve the development of transportation technology. This paper discusses the performance indicators system of 863 projects in the transportation field in terms of objective management. Based on issues existing in current project evaluation, some new indicators are introduced, which are employed to evaluate the correlation between achievements of project and research objective as well as key technology, rationality of check indices setup, and maneuverability of check process respectively. An evaluation model and its modification approach are also proposed. Finally, taking evaluation of 863 projects in the transportation field as an example, the credibility of the approaches is presented.

Key words: integrated trasportation, state 863 projects, performance indicators setup, science and technology project performance evaluation, data envelopment analysis (DEA)

摘要:

从“十一五”开始,国家863计划设立了现代交通技术领域,对促进我国交通领域技术进步起到了积极的作用.本文从目标管理的角度,对交通领域863计划项目的考核指标设置进行了探讨.在分析目前项目评价过程中存在问题的基础上,提出了项目考核指标与研究目标及关键技术的相关性、考核指标设置的合理性、考核过程的可操作性等新的评价指标,并建立了相应的评价模型及其修正方法.最后以交通领域863计划项目的评价为示例说明了方法的可用性.

关键词: 综合交通运输;国家863 计划, 考核指标设置;科技项目评价;数据包络分析

CLC Number: