[1] 邓念, 彭其渊, 占曙光. 干扰条件下高速铁路列车运行实时调整问题研究[J]. 交通运输系统工程与信息, 2017, 17(4): 118-123. [DENG N, PENG Q Y, ZHAN S G. Real-time train rescheduling on high-speed railway under disruption condition[J]. Journal of Transportation Systems Engineering & Information Technology, 2017, 17(4): 118-123.]
[2] PARK B H, SEO Y I, HONG S P, et al. Column generation approach to line planning with various halting patterns—application to the korean high-speed railway[J]. Asia-Pacific Journal of Operational Research, 2013, 30(4): 123-141.
[3] KECMAN P, GOVERDE R M P. Online data-driven adaptive prediction of train event times[J]. IEEE Transactions on Intelligent Transportation Systems, 2015, 16(1): 465-474.
[4] CORMAN F, D’ARIANO A, PACCIARELLI D, et al. Evaluation of green wave policy in real- time railway traffic management[J]. Transportation Research Part C: Emerging Technologies, 2009, 17(6): 607-616.
[5] 柏赟, 何天健, 毛保华. 一种交叉线干扰情形下列车晚点恢复运行控制方法[J]. 交通运输系统工程与信息, 2011, 11(5): 114-122. [BAI Y, HO T K, MAO B H. Train control to reduce delays upon service disturbances at railway junctions[J]. Journal of Transportation Systems Engineering & Information Technology, 2011, 11(5): 114-122.]
[6] 庄河, 文超, 李忠灿, 等. 基于高速列车运行实绩的致因-初始晚点时长分布模型[J]. 铁道学报, 2017, 39 (9): 25-31. [ZHUANG H, WEN C, LI Z C, et al. Cause based primary delay distribution models of high-speed trains on account of operation record[J]. Journal of the China Railway Society, 2017, 39(9): 25-31.]
[7] 孟令云, GOVERDE R M P. 基于实际数据分析的列车晚点传播过程构建方法与实例[J]. 北京交通大学学报, 2012, 36(6): 15-20. [MENG L Y, GOVERDE R M P. A method for constructing train delay propagation process by mining train record data[J]. Journal of Beijing Jiaotong University, 2012, 36(6): 15-20.]
[8] HANSEN E, PACHL J. Railway timetable & traffic: analysis, modelling, simulation[M]. Eurailpress, 2008.
[9] 胡跃兵, 蔺红生. 多质点列车牵引计算系统设计与实现[J]. 中国铁路, 2013(6): 47-50. [HU Y B, LIN H S. Design and implementation of train traction analysis system based on multi-particle model[J]. Chinese Railway, 2013(6): 47-50.]
[10] BEŠINOVI? N, QUAGLIETTA E, GOVERDE R M P. A simulation-based optimization approach for the calibration of dynamic train speed profiles[J]. Journal of Rail Transport Planning & Management, 2013, 3(4): 126-136. |