[1] YAGHINI M, FOROUGHI A, NADJARI B. Solving railroad blocking problem using ant colony optimization algorithm[J]. Applied Mathematical Modelling, 2011, 35 (12): 5579-5591.
[2] KRAFT E R. A hump sequencing algorithm for real time management of train connection reliability[C]//Journal of the Transportation Research Forum, 2000, 39(4):95.
[3] 呼志刚, 黎浩东, 何世伟. 铁路编组站列车解编顺序优化[J]. 北京交通大学学报, 2017, 41(6): 61-68,75. [HU Z G, LI H D, HE S W. Optimization of hump and assemble sequence of trains in railway marshalling yard [J]. Journal of Beijing Jiaotong University, 2017, 41(6): 61-68,75.]
[4] 黎浩东, 宋瑞, 何世伟, 等. 基于列车解编作业时间估算的编组站阶段计划配流优化[J]. 中南大学学报(自然科学版), 2014, 45(1): 317-327. [LI H D, SONG R, HE S W, et al. Wagon-flow allocation of stage plan for marshaling station based on time estimation of breakup and makeup of trains[J]. Journal of Central South University(Science and Technology), 2014, 45(1): 317- 327.]
[5] 景云. 不确定条件下编组站调度系统配流模型及算法研究[D]. 成都: 西南交通大学, 2010. [JING Y. The model and algorithm of wagon- flow allocation in dispatching systems of marshalling station under uncertainty[D]. Chengdu: Southwest Jiaotong University, 2010.]
[6] 薛锋. 编组站调度系统配流协同优化理论与方法研究 [D]. 成 都: 西 南 交 通 大 学, 2009. [XUE F. Study on collaborative optimization theory and method of wagonflow allocation in dispatching system of marshalling station[D]. Chengdu: Southwest Jiaotong University, 2009.]
[7] PETER D, DENIS K, LILIYA R, et al. Optimization of train routes based on neuro-fuzzy modeling and genetic algorithms[J]. Procedia Computer Science, 2019, 149: 11-18.
[8] 吴昕阳. 基于动态货流的铁路货物列车开行方案研究 [D]. 成都: 西南交通大学, 2018: 25- 26. [WU X Y. Study on the operation scheme of railway freight train based on dynamic flow[D]. Chengdu: Southwest Jiaotong University, 2018: 25-26.] |