|
[1]国家发展和改革委员会.2024年全国物流运行情况通报[EB/OL]. (2025-02-14) [2025-08-02]. https://www.
ndrc.gov.cn/ xwdt/ztzl/ shwltj/ qgsj/ 202502/t20250214_
1396183.html. [National Development and Reform
Commission. 2024 national logistics performance report
[EB/OL]. (2025-02-14) [2025-08-02]. https://www.
ndrc.gov.cn/ xwdt/ ztzl/ shwltj/ qgsj/ 202502/t20250214_
1396183.html.]
[2]田宇,周强,朱本飞.自动化集装箱码头双循环AGV与场桥的集成调度研究[J].交通运输系统工程与信息,
2020, 20(4): 216-223, 243. [TIAN Y, ZHOU Q, ZHU B
F. Integrated scheduling of dual-cycle AGV and yard
crane at automated container terminal[J]. Journal of
Transportation Systems Engineering and Information
Technology, 2020, 20(4): 216-223, 243.]
[3]黄飘,郑祖杰,李新宇,等.滚动生产模式下的柔性作业车间调度问题[J]. 计算机集成制造系统,2025,31
(4): 1287-1298. [HUANG P, ZHENG Z J, LI X Y, et al.
Flexible job-shop scheduling problem in rolling
production mode[J]. Computer Integrated Manufacturing
Systems, 2025, 31(4): 1287-1298.]
[4]POLTEN L, EMDE S. Scheduling automated guided
vehicles in very narrow aisle warehouses[J]. Omega,
2021, 99: 1-20.
[5]
姜兴宇,王明皓,刘伟军,等.药品仓库堆垛机与AGV集成调度优化[J]. 计算机集成制造系统,2022,28(1):
230-241. [JIANG X Y, WANG M H, LIU W J, et al.
Integrated scheduling optimization of pharmaceutical
warehouse stacker and AGV[J]. Computer Integrated
Manufacturing Systems, 2022, 28(1): 230-241.]
[6]AMIRTEIMOORI A, MOHAMED M, KIA R.
Simultaneous scheduling of jobs and transporters in a
hybrid flow shop with collision-free transporter routing:
A novel parallel heuristic[J]. Computers & Operations
Research, 2024, 168: 106687.
[7]MASONE A, MURINO T, STERLE C, et al. A MILP
formulation for an automated guided vehicle scheduling
problem with battery constraints[C]//IFIP International
Conference on Advances in Production Management
Systems. Cham: Springer International Publishing, 2021:
15-23.
[8]BOCCIA M, MANCUSO A, MASONE A, et al. Exact and
heuristic solution approaches for the multi-objective
AGV scheduling problem with battery constraints[J].
Transportation Research Procedia, 2024, 78: 369-376.
[9]
LI Y, WEN X, ZHOU S, et al. Smart automated guided
vehicle scheduling with flexible battery management: A
new formulation and an exact approach[J]. Computers &
Operations Research, 2025, 183: 107156.
[10] NADERI B, AZAB A. Modeling and heuristics for
scheduling of distributed job shops[J]. Expert Systems
with Applications, 2014, 41(17): 7754-7763.
[11] YUE L J, FAN H M, FAN H. Blocks allocation and
handling equipment scheduling in automatic container
terminals[J]. Transportation Research Part C: Emerging
Technologies, 2023, 153: 104228.
[12] HOOKER J, OTTOSSON G. Logic-based benders
decomposition[J]. Mathematical Programming, 2003, 96
(1): 33-60.
[13] BOCCIA M, MASONE A, STERLE C, et al. The parallel
AGV scheduling problem with battery constraints: A new
formulation and a matheuristic approach[J]. European
Journal of Operational Research, 2023, 307(2): 590-603.
|