交通运输系统工程与信息 ›› 2001, Vol. 1 ›› Issue (4): 338-340 .

• 系统工程理论与方法 • 上一篇    下一篇

试论新运行图下编组站到解子系统的工作组织

冷强田, 韩宝明, 滕 靖   

  1. 北京交通大学交通运输学院,北京100044
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2001-11-01 发布日期:2001-11-01

A Discussion on Organizing the Arriving and Disintegrating
System of Marshalling Station in New Train Diagram

LENG Qiang-tian, HAN Bao-ming, TENG Jing   

  1. College of Traffic and Transport, Northern Jiaotong University, Beijing 100044, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2001-11-01 Published:2001-11-01

摘要: 通过分析现行列车运行图下输入车流对编组站到解系统的影响,指出了编组站到解系
统所存在的部分问题,并针对问题提出了在运输组织方面的对策方案.

关键词: 编组站, 到解系统, 不均衡性, 工作效率

Abstract: By analysing the influence of inputing wagon flow on arriving and disintegrating system of marshalling station. this paper analyses the problem in the arriving and disintegrating
system of marshalling station and put forward the countermeasure in transportation organizing.

Key words: marshalling station, arriving &, disintegrating system, disequilibrium, working efficiency