[1] INGOLOTTI L, BARBER F, TORMOS P, et al. An
efficient method to schedule new trains on a heavily loaded railway network[C]//LEMAÎTREC,REYESCA,
GONZÁLEZ J A. Advances in Artificial Intelligence
IBERAMIA2004, Berlin, Heidelberg: Springer Berlin
Heidelberg,2004,3315:164-173.
[2] GAOY.Three-stage optimization method for theproblem
of scheduling additional trains on a high-speed rail
corridor[J].Omega,2018,80(2018):175-191.
[3] LIUY,CAOC. Amulti-objective trainoperational plan
optimization approach for adding additional trains ona
high-speed railway corridorinpeak periods[J].Applied
Sciences,2020,10(16):5554.
[4]江峰,倪少权,吕红霞.基于拉格朗日松弛的高速铁路列车运行图新增运行线局部调整模型[J].交通运输系统工程与信息,2018,18(4):163-170. [JIANGF,NIS
Q, LVHX. Ahigh-speed railway new-added train
timetable partial adjust mentmodel basedon lagrangian
relaxation[J]. Journal of Transportation Systems
Engineering and Information Technology, 2018, 18(4):
163-170.]
[5]高如虎,牛惠民,江雨星.基于多维网络的增开列车条件下高速铁路列车运行图调整[J].铁道学报,2020,42
(5): 1-8. [GAORH, NIUHM, JIANGYX. Train
timetable rescheduling based on a time-station-track
multi-dimensional network under condition of running
extra trains for high-speed railway[J]. Journal of the
ChinaRailwaySociety,2020,42(5):1-8.]
[6]高如虎,牛惠民.基于ADMM方法的新增列车条件下灵活的列车时刻表优化算法研究[J].铁道学报,2021,
43(2):21-29. [GAORH,NIUHM.Study on additional
train timetable algorithm in flexiblemanner based on
admmapproach[J].Journal of the China Railway Society,
2021,43(2):21-29.]
[7] TANYY,LIYX,WANGRX. Schedulingextra train
paths into cyclic timetable based on the genetical gorithm[J]. IEEE Access, 2020, 8: 102199-102211.
[8]TAN Y, XU W, JIANG Z, et al. Inserting extra train
services on high-speed railway[J]. Periodica Polytechnica
Transportation Engineering, 2020, 49(1): 16-24.
[9]
TAN Y Y, JIANG Z B, LI Y X, et al. Integration of train
set circulation and adding train paths problem based on
an existing cyclic timetable[J]. IEEE Access, 2020, 8:
87142-87163.
[10] D'ARIANO A, PRANZO M, HANSEN I A. Conflict
resolution and train speed coordination for solving real-time timetable perturbations[J]. IEEE Transactions on Intelligent Transportation Systems, 2007, 8(2): 208-222.
[11] BURDETT R L, KOZAN E. Techniques for inserting
additional
trains
into
existing
timetables[J].
Transportation Research Part B: Methodological, 2009,
43(8/9): 821-836.
[12] TAN Y, JIANG Z. A branch and bound algorithm and
iterative reordering strategies for inserting additional
trains in real time: A case study in Germany[J].
Mathematical Problems in Engineering, 2015, 2015:
1-12
|