[1]Gambardella L M, Mastrolilli M, Rizzoli A E,et al An optimization methodology for intermodal terminal management [J]. Journal of Intelligent Manufacturing, 2001, 12(5/6):521-534.
[2]王斌.集装箱堆场基于混堆的滚动式计划堆存方法 [J]. 系统工程学报, 2005, 20(5): 466-471.[WANG B, Method of planned rolling period of a container yard based on mixture storage[J]Journal of Systems Engineering, 2005,20(5):466-471.]
[3]郑红星,杜亮,董键.混堆模式下集装箱堆场箱位指派优化模型[J].交通运输系统工程与信息, 2012,12(1):153-159. [ZHENG H X, DU L, DONG J, Optimization model on container slot allocation in container yard with mixed storage mode [J], Journal of Transportation Systems Engineering and Information Technology, 2012,12(1):153-159.]
[4]Kim H K, Lee K M, Hwang H. Sequencing delivery and receiving operations for yard cranes in port container terminals [J]. Int. J. Production Economics, 2003,84(3):283-292.
[5]韩晓龙.集装箱港口龙门吊的最优路径问题[J].上海海事大学学报,2005,26(2):39-41. [HAN X L. Routing problem of transfer crane at container terminals [J]. Journal of Shanghai Maritime University, 2005, 26(2):39-41.]
[6]W C Ng, K L Mak. An effective heuristic for scheduling a yard crane to handle jobs with different ready times [J]. Engineering Optimization, 2005,37(8):867-877.
[7]Wenkai L, Yong W, M E H P,et alDiscrete time model and algorithms for container yard crane scheduling [J].European Journal of Operational Research, 2009, 198(1):165-172.
[8]Matthew E H P, Yong W, Wenkai Li,et al.Development and simulation analysis of realtime yard crane control systems for seaport container transshipment terminals [J].OR Spectrum, 2009, 31(4):801-835.
[9]乐美龙,林艳艳,范志强.基于两阶段启发式算法的多场桥作业调度研究[J].武汉理工大学学报,2012,34(1):60-65. [LE M L, LIN Y Y, FAN Z Q, Research on multiyardcrane scheduling problem based on twophase heuristic algorithm[J], Journal of Wuhan University of Technology, 2012,34(1):60-65.] |