[1]Troutbeck R J, Kako S. Limited priority merge at unsignalized intersections[J]. Transportation Research A, 1999, 33: 291-304. [2]Moshe A, Pollatschek, Abishai Polus, et al. A decision model for gap acceptance and capacity at intersections[J]. Transportation Research B, 2002, 36:649-663. [3]赵春, 王炜, 李文权. 主路不同流量条件下入口匝道通行能力研究[J]. 公路交通科技, 2005,22(2):82-85. [ZHAO C, WANG W, LI W Q. On-ramp capacity under different flow rate of major stream[J]. Journal of Highway and Transportation Research and Development, 2005, 22(2): 82-85.] [4]覃煜, 晏克非. 高架道路上匝道通行能力理论模型研究[J]. 武汉交通科技大学学报,2000,24(6):611-614.[QIN Y, YAN K F. On the capacity model for in-ramp terminal of elevated road[J]. Journal of Wuhan Transportation University, 2000, 24(6): 611-614.] [5]Ashworth R. The capacity of priority-type intersection with a non-uniform distribution of critical acceptance gaps[J]. Transportation Research , 1969, 3:273-278. [6]Polus A, Shmueli S, Moshe Livneh. Critical gap as a function of waiting time in determining roundabout capacity[J]. Journal of Transportation Engineering, 2003, 129(5):504-509. [7]Polus A, Shmueli S. Entry capacity of roundabouts and impact of waiting times[J]. Road Transport Research, 1999, 8(3):43-54. [8]Hideyuki Kita. Effects of merging lane length on the merging behavior at expressway on-ramps[C]//Proceedings of the 12th International Symposium on Transportation and Traffic Theory, Berkeley, Calif. Edited by C.F. Daganzo. Elsevier Science Ltd., New York, 1993: 37-51. [9]李文权, 王炜. 高速公路上匝道合流区通行能力分析[C].中国运筹学会第七届学术交流会论文集,2004,Global-Link,1119-1127. [LI W Q, WANG W. Highway capacity analysis for on-ramp freeway junction[C]. Proceedings of the Seventh National Conference of Operations Research Society of China, 2004, Global-Link, 1119-1127.] [10]慈玉生, 吴丽娜, 裴玉龙, 等. 快速路入口匝道连接段通行能力间隙接受模型[J]. 交通运输系统工程与信息, 2009, 9(4):116-119.[CI Y S, WU L N, PEI Y L, et al. Gap acceptance capacity model for on-ramp junction of urban freeway[J]. Journal of Transportation Systems Engineering and Information Technology, 2009, 9(4):116-119.] |