[1] Shen Y, Xia J. Integrated bus transit scheduling for theBeijing bus group based on a unified mode of operation[J]. International Transactions in Operational Research, 2009, 16(2): 227-242.
[2]宋晓梅,于雷. 常规公交微观区间运行时间可靠性评价模型研究[J]. 交通运输系统工程与信息,2012,12(2):144-149. [SONG X M,YU L. Travel time reliability evaluation model for adjacent bus roads [J]. Journal of Transportation Systems Engineering and Information Technology, 2012, 12(2): 144-149.]
[3]Furth P, Hemily B, Muller T, et al. Using archived AVLAPC data to improve transit performance and management[R]. Transit Cooperative Research Program,Report No. 113, Washington DC: Transportation Research Board, 2006.
[4]Mazloumi E, Currie G, Rose G. Using GPS data to gaininsight into public transport travel time variability [J]. Journal of Transportation Engineering, 2010,136(7): 623-631.
[5]Tetreault P R , ElGeneidy A M. Estimating bus run times for new limitedstop service using archived AVL and APC data [J]. Transportation Research Part A: Policy and Practice, 2010,44(6): 390-402.
[6]陈维亚,陈治亚. 基于随机仿真的高频公交服务可靠性分析[J]. 交通运输系统工程与信息, 2009,9(5):130-134.[CHEN W L, CHEN Z Y. Service reliability analysis of high frequency transit using stochastic simulation [J]. Journal of Transportation Systems Engineering and Information Technology, 2009,9(5): 130-134.]
[7]白思俊.系统工程 [M].北京:电子工业出版社,2006:195-203.[BAI S J. Systems engineering [M]. Beijing: Publishing House of Electronics Industry, 2006: 195-203.] |