[1] 毛保华, 张政, 陈志杰, 等. 城市轨道交通网络化运营组织技术研究评述[J]. 交通运输系统工程与信息, 2017, 17(6): 155-163. [MAO B H, ZHANG Z, CHEN Z J, et al. A review on operational technologies of urban rail transit networks[J]. Journal of Transportation Systems Engineering and Information Technology, 2017, 17(6): 155-163.]
[2] 史芮嘉. 城市轨道交通系统输送能力利用率测算及优化 研 究 [D]. 北 京: 北 京 交 通 大 学, 2017. [SHI R J. Calculation and optimization for the conveying capacity utilization of urban rail transit[D]. Beijing: Beijing Jiaotong University, 2017.]
[3] GB/T 30012-2013, 城市轨道交通运营管理规范[S]. 2013. [GB/T 30012- 2013, Regulations for operation management of urban rail transit[S]. 2013.]
[4] DOMSCHKE W. Schedule synchronization for public transit networks[J]. Operations Research Spektrum, 1989, 11(1): 17-24.
[5] GOVERDE R M B. Synchronization control of scheduled train services to minimize passenger waiting times[C]. Transport, Infrastructure and Logistics; Competition, Innovation and Creativity: Proc.4th TRAIL Annual Congress Part 2, Delft: Delft University Press, 1998.
[6] WONG R C W, YUEN T W Y, FUNG KW, et al. Optimizing timetable synchronization for rail mass transit[J]. Transportation Science, 2008, 42(1): 57-69.
[7] KWAN C M, CHANG C S. Timetable synchronization of mass rapid transit system using multi- objective evolutionary approach[J]. IEEE Transactions on Systems Man & Cybernetics Part C, 2008, 38(5): 636-648.
[8] 徐瑞华, 李璇. 城市轨道交通网络末班车衔接方案的综合优化[J]. 同济大学学报(自然科学版), 2012, 40 (10): 1510- 1516. [XU R H, LI X. Comprehensive optimization for connection scheme of last trains in urban mass transit network[J]. Journal of Tongji University (Natural Science), 2012, 40(10): 1510-1516.]
[9] KANG L, WU J, SUN H, et al. A case study on the coordination of last trains for the Beijing subway network[J]. Transportation Research Part B: Methodological, 2015(72): 112-127.
[10] BOOKBINDER J H, DÉSILETS A. Transfer optimization in a transit network[J]. Transportation Science, 1992, 26 (2): 106-118.
[11] DADUNA J R, VOß S. Practical experiences in schedule synchronization[C]//Daduna J R, Branco I, Paixão J M P (eds) Computer- Aided Transit Scheduling. Berlin, Heidelberg: Springer, 1995: 39-55.
[12] CARPANETO G, DELL'AMICO M, FISCHETTI M, et al. A branch and bound algorithm for the multiple depot vehicle scheduling problem[J]. Networks, 1989, 19 (19): 531-548.
[13] DELL'AMICO M, FISCHETTI M, TOTH P. Heuristic algorithms for the multiple depot vehicle scheduling problem [J]. Management Science, 1993(39): 115-125.
[14] DESAULNIERS G, DESROSIERS J, LOACHIM I, et al. A unifi ed framework for deterministic time constrained vehicle routing and crew scheduling problems[C]// Crainic T G, Laporte G. (Eds.) Fleet management and logistics. Boston, MA: Springer, 1998: 57-93.
[15] HUISMAN D, FRELING R, WAGELMANS A P M. Multiple- depot integrated vehicle and crew scheduling[J]. Transportation Science, 2005, 39(4): 491-502.
[16] PEPIN A S, DESAULNIERS G, HERTZ A, et al. A comparison of five heuristics for the multiple depot vehicle scheduling problem[J]. Journal of Scheduling, 2009, 12(1): 17-30. |