[1] |
LIU Wen , WANG Wen-bo.
A Vessel Trajectory Reconstruction Method Based on Low-rank
Minimization Matrix Denoising
[J]. Journal of Transportation Systems Engineering and Information Technology, 2022, 22(1): 106-114.
|
[2] |
HUANG Shi-chen, SHAO Chun-fu, LI Juan, ZHANG Xiao-yu, QIAN Jian-pei.
Vehicle Trajectory Reconstruction and Anomaly Detection Using Deep Learning
[J]. Journal of Transportation Systems Engineering and Information Technology, 2021, 21(3): 47-54.
|
[3] |
ZHANG Hui-ling, LIU Xiao-xiao, XU Yu-dong.
Delay Extraction Based on Vehicle's Trajectory Reconstruction at Signalized Intersection
[J]. Journal of Transportation Systems Engineering and Information Technology, 2020, 20(2): 237-243.
|
[4] |
YU Zhi, HUANG Liu-hong, LI Xi-ying, LI Bo, ZOU Bing.
Queueing Process Sensing and Prediction at Intersection Based on Video
[J]. Journal of Transportation Systems Engineering and Information Technology, 2020, 20(1): 33-39.
|
[5] |
YU Zhi, LIAO Qiong-hua, HE Zhao-cheng.
Vehicle Trajectory Reconstruction in Signalized-link Using Vehicle Identification Data
[J]. Journal of Transportation Systems Engineering and Information Technology, 2019, 19(4): 87-93.
|
[6] |
PENG Hong-qin, ZHANG Guo-wu.
Celebrating the 32nd Anniversary of the Institute of Systems Engineering and Founding of Civil Aviation Specialty
[J]. Journal of Transportation Systems Engineering and Information Technology, 2019, 19(1): 2-5.
|
[7] |
SHUAI Bin, HUAN GWen-cheng, ZHANG Shi-hang, PANG Deng-yu, HE Xiao-feng.
Construction Index System Establishment and Index Solution of Chinese Intercity Railway
[J]. Journal of Transportation Systems Engineering and Information Technology, 2018, 18(1): 30-36.
|
[8] |
LI Yan,ZHOUWen-hui,NAN Si-rui,CHEN Kuan-min.
Reliability Based Optimization of Construction Arrangement for Single Rail Transit Work Zone
[J]. Journal of Transportation Systems Engineering and Information Technology, 2017, 17(5): 250-256.
|
[9] |
LU Rui, LI Xue-wei, CHEN Yong-jun.
Rough Set Bidding Decision Method for Railway Construction Project
[J]. Journal of Transportation Systems Engineering and Information Technology, 2017, 17(1): 14-19.
|
[10] |
SONG Chu-jun,LEI Ding-you,SHAN Yuan.
The Investment and Construction Decision-making Research of Tourism Highway Based on Prediction of Scenic Spot Tourist Flow
[J]. Journal of Transportation Systems Engineering and Information Technology, 2017, 17(1): 20-26.
|
[11] |
WU Jiang, JIAYuan-hua.
Application of Elastic Coefficient Method in the Construction of Intercity High-speed Railway
[J]. Journal of Transportation Systems Engineering and Information Technology, 2016, 16(4): 60-66.
|
[12] |
ZHONG Yan,DONG Sheng-ying,LIU Reng-kui,ZHANG Ling.
Optimization Model of Railway Construction Project Schedule
[J]. Journal of Transportation Systems Engineering and Information Technology, 2015, 15(5): 186-194.
|
[13] |
WANG Bo-bin, SHAO Chun-fu, JI Xun, ZHU-GE Cheng-xiang, YANG Ting.
Reconstruction Mechanisms of Holiday Tour under Integrated Multimodal Travel Information Service
[J]. Journal of Transportation Systems Engineering and Information Technology, 2015, 15(4): 99-105.
|
[14] |
DENG Ming-jun, QU Shi-ru,QIN ming.
Spectral Analysis Applied in Road Travel Time Multi Step Prediction
[J]. Journal of Transportation Systems Engineering and Information Technology, 2015, 15(3): 134-139.
|
[15] |
LUO Yun-qian,CHEN Zhi-jie,TANG Jin-hui,ZHU Yong-wen.
Flight Delay Prediction Using Support Vector Machine Regression
[J]. Journal of Transportation Systems Engineering and Information Technology, 2015, 15(1): 143-149.
|