[1] Avishai Ceder. Public Transit Planning and Operation: Theory, Modeling and Practice[M]. Butterworth-Heinemann,2007.
[2] 胡启洲,邓卫,张卫华.城市公交线网的灰色评价及其应用[J].交通运输系统工程与信息,2006,6(2):57-61. [Hu Q Z, Deng W, Zhang W H. A Grey-Theory-Based evaluation with application for urban public traffic network[J]. Journal of Transportation Systems Engineering and Information Technology, 2006,6(2):57-61.]
[3] 胡开桥.公交线网评价指标体系研究[J].公路与汽运,2009,6:36-41. [Hu K Q. Research on Public transportation network evaluation index system[J]. Highways & Automotive Applications, 2009,6:36-41.]
[4] 王海涌,刘丽艳,郑丽英. 模糊综合评价法在城市公交线网评价中应用[J].兰州交通大学学报(自然科学版),2004,3(23):69-73. [Wang H Y, Liu L Y, Zheng L Y. Application of fuzzy synthesis evaluation method in urban public traffic line network[J]. Journal of Lanzhou Jiaotong University(Natural Sciences),2004,3(23):69-73.]
[5] Rolf Aaberge. Axiomatic Characterization of the Gini Coefficient and Lorenz Curve Orderings[J]. Journal of Economic Theory,2001,101(1):115-132.
[6] Duangkamon Chotikapanich1, William Griffiths. On Calculation of the Extended Gini Coefficient[J], Review of Income and Wealth,2001,47(4) :541-547
[7] 过秀成.城市交通规划[M].南京,东南大学出版社,2010. [Guo X C. Urban transport planning[M]. Nanjing, Southeast University Press,2010.]
[8] 洪兴建.基尼系数理论研究[M].北京,经济科学出版社,2008. [Hong X J. Theoretical study of the Gini coefficient[M]. Beijing, Economic Science Press,2008.] |