[1] LI W K, WU Y, PETERING M E H, et al. Discrete time model and algorithms for container yard crane scheduling[J]. European Journal of Operational Research, 2009(198): 165-172.
[2] HE J L, HUANG Y F, YAN W. Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption[J]. Advanced Engineering Informatics, 2014(9): 1-17.
[3] 李建忠,韩晓龙. 集装箱港口堆场轮胎式龙门起重机 的动态优化配置[J]. 上海海事大学学报, 2005, 26(3): 44-48. [LI J Z, HAN X L. Dynamic crane deployment in container storage yard[J]. Journal of Shanghai Maritime University, 2005, 26(3): 44-48]
[4] 韩晓龙. 集装箱港口装卸中的龙门吊数量配 置[J]. 系统工程, 2005, 23(10): 12-16. [HAN X L. Determination of the number of yard cranes in container terminal charge/discharge[J]. Systems Engineering, 2005, 23(10): 12-16.]
[5] 韩晓龙,丁以中. 集装箱港口龙门吊配置优化研究[J]. 中国航海, 2008, 31(1): 6-14. [HAN X L, DING Y Z. Yard crane allocation and optimization in container terminal[J]. Navigation of China, 2008, 31(1): 6-14.]
[6] KIM K Y, KIM K H. An optimal routing algorithm for a transfer crane in port container terminals[J]. Transportation Science, 1999, 33(1): 17-33.
[7] NARSIMHAN A, PALEKAR U S. Analysis and algorithms for the transtainer routing problem in container port operations[J]. Transportation Science, 2002, 36(1): 63-78.
[8] 韩晓龙. 集装箱港口龙门吊的最优路径问题[J]. 上 海海事大学学报, 2005, 26(2): 39-41. [HAN X L. Routing problem of transfer crane at container terminal[J]. Journal of Shanghai Maritime University, 2005, 26(2): 39-41.]
[9] 林艳艳,乐美龙. 考虑干涉情况的多台龙门吊作业路 径优化[J]. 上海海事大学学报, 2012, 33(2): 47-54. [LIN Y Y, LE M L. Optimal routing of multi-yard-crane considering interference condition[J]. Journal of Shanghai Maritime University, 2012, 33(2): 47-54.]
[10] PETERING M E H, MURTY K G. Effect of block length and yard crane deployment systems on overall performance at a seaport container transshipment terminal[J]. Computers & Operations Research, 2009 (36): 1711-1725.
[11] LINN R, LIU J Y, WAN Y W, et al. Rubber tired gantry crane deployment for container yard operation[J]. Computers & Industrial Engineering, 2003, 45(3): 429- 442.
[12] 何军良,宓为建,严伟. 基于爬山算法的集装箱堆场场 桥调度[J]. 上海海事大学学报, 2007, 28(4): 11-15. [HE J L, MI W J, YAN W. Container yard crane scheduling based on hill climbing algorithm[J]. Journal of Shanghai Maritime University, 2007, 28(4): 11-15.] |