[1] 陈菁菁. 城市轨道交通网络运营可靠性研究[D]. 上海: 同济大学, 2007. [CHEN J J. Reliability of urban rail network operation[D]. Shanghai: Tongji University, 2007.]
[2] 刘小霞. 城市轨道交通网络突发客流传播影响分析[D]. 北京: 北京交通大学, 2011. [LIU X X. Unexpected passenger flow propagation analysis in urban rail transit network[D]. Beijing: Beijing Jiaotong University, 2011.]
[3] 段力伟, 文超, 彭其渊. 突发大客流在城市轨道交通网络中的传播机理[J]. 铁道运输与经济, 2012, 34(8): 79-84. [DUAN L W, WEN C, PENG Q Y. Transmission mechanism of sudden large passenger flow in urban rail transit network[J]. Railway Transport and Economy, 2012, 34(8): 79-84.]
[4] 张铭. 城市轨道交通网络运营计划协调优化研究[D]. 上海: 同济大学, 2008. [ZHANG M. Coordination and optimization for transportation plan of urban rail transit net[D]. Shanghai: Tongji University, 2008.]
[5] SCHACHTEBECK M, SCHÖBEL A. To wait or not to wait—and who goes first? Delay management with priority decisions[J]. Transportation Science, 2010, 44 (3): 307-321.
[6] DOLLEVOET T, HUISMAN D, SCHMIDT M, et al. Delay management with rerouting of passengers[J]. Transportation Science, 2012, 46(1): 74-89.
[7] 徐瑞华, 叶剑鸣, 潘寒川. 列车运行延误条件下城市轨道交通网络换乘站大客流预警方法[J]. 中国铁道科学, 2014, 35(5): 127-133. [XU R H, YE J M, PAN H C. Method for early warning of heavy passenger flow at transfer station of urban rail transit network under train delay[J]. China Railway Science, 2014, 35(5): 127-133.]
[8] 刘涛, 徐瑞华. 基于行车间隔协调调整的换乘站大客流处置[J]. 城市轨道交通研究, 2014, 17(2): 50-53. [LIU T, XU R H. Disposal of large passenger flow at transfer station based on coordinated headways adjustment[J]. Urban Mass Transit, 2014, 17(2): 50-53.]
[9] 李伟, 徐瑞华, 朱炜. 运行延误下地铁换乘站多线协同客流处置方法[J]. 同济大学学报(自然科学版), 2015, 43(2): 239-244. [LI W, XU R H, ZHU W. Multiline cooperation method for passenger flow disposal in metro transfer station under train delay[J]. Journal of Tongji University(Natural Science), 2015, 43(2): 239- 244.]
[10] 刘剑锋, 孙福亮, 柏赟, 等. 城市轨道交通乘客路径选择模型及算法[J]. 交通运输系统工程与信息, 2009, 9 (2): 81-86. [LIU J F, SUN F L, BAI Y, et al. Passenger flow route assignment model and algorithm for urban rail transit network[J]. Journal of Transportation Systems Engineering and Information Technology, 2009, 9(2): 81-86.] 170 |