[1] 曾庆成, 赵孝峰, 胡祥培, 等. 集装箱码头泊位计划的鲁棒优化模型[J]. 运筹与管理, 2015, 25(2): 71-77. [ZENG Q C, ZHAO X F, HU X P, et al. Robust optimization model for berth planning problem in container terminals[J]. Operations Research and Management Science, 2015, 25 (2): 71-77.]
[2] ZHEN L, LIANG Z, ZHUGE D, et al. Daily berth planning in a tidal port with channel flow control[J]. Transportation Research Part B, 2017, 106(2017): 193-217.
[3] 常祎妹, 朱晓宁, 闫柏丞, 等. 集装箱码头铁水联运装卸设备协同调度[J]. 交通运输系统工程与信息, 2017, 17(4): 40-47. [CHANG Y M, ZHU X N, YAN B C, et al. Integrated scheduling of handling operations in container terminal under rail- water intermodal transportation[J]. Journal of Transportation Systems Engineering and Information Technology, 2017, 17 (4): 40-47.]
[4] GOLIAS M M. A bi-objective berth allocation formulation to account for vessel handling time uncertainty[J]. Maritime Economics & Logistics, 2011, 13(4): 419-441.
[5] HAN X, LU Z. A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time[J]. European Journal of Operational Research, 2010, 207(3): 1327-1340.
[6] XU Y, CHEN Q, QUAN X. Robust berth scheduling with uncertain vessel delay and handling time[J]. Annals of Operations Research, 2012, 192 (1): 123-140.
[7] KARAFA J, GOLIAS M M, IVEY S, et al. The berth allocation problem with stochastic vessel handling times[J]. International Journal of Advanced Manufacturing Technology, 2013, 65 (1-4): 473-484.
[8] ZHEN L. Tactical berth allocation under uncertainty[J]. European Journal of Operational Research, 2015, 247 (3): 928-944. |