[1] 倪少权, 张杰, 等. 市场导向动态列车运行图协同编制理论及系统设计[M]. 北京:科学出版社, 2019. [NI S Q, ZHANG J, et al. Theoretical methods and system design for market-oriented and dynamic train scheduling[M]. Beijing: Science Press, 2019.]
[2] IRELAND P, CASE R, FALLIS J, et al. The canadian pacific railway transforms operations by using models to develop its operatingplans[J]. Interfaces, 2004, 34(1): 5- 14.
[3] CRAINIC T G. Service network design in freight transportation[J]. European Journal of Operation Research, 2000, 122(2): 272-288.
[4] 刘晓伟, 仇戈, 等.考虑车流时空分布不均衡的货物列车开行方案优化研究[J]. 交通运输系统工程与信息, 2019, 19(2): 137-145. [LIU X W, QIU G, et al. Freight transportation service network design problem with unbalanced spatio-temporal distribution of wagon-flow[J]. Journal of Transportation Systems Engineering and Information Technology, 2019, 19(2): 137-145.]
[5] 梁栋, 林柏梁. 铁路空车调整的多阶段策略优化模型研究[J]. 铁道学报, 2007, 29(1): 1-6. [LIANG D, LIN B L. Research on the multi-stage optimization model of empty railcar distribution[J]. Journal of China Railway Society, 2007, 29(1): 1-6.]
[6] 王波, 荣朝和, 等.铁路空车调配的多时点优化模型研究[J]. 交通运输系统工程与信息, 2015, 15(5): 157- 163, 171. [WANG B, RONG C H, et al. Multi-time point optimization model for empty railcar distribution[J]. Journal of Transportation Systems Engineering and Information Technology, 2015, 15(5): 157-163, 171.]
[7] KIKUCHI S. Empty freight car dispatching model underfreight car pool concept[J]. Transportation Research Part B, 1985, 19(2): 169-185.
[8] GLICKMAN T S, SHERALI H D. Large scale network distribution of pooled empty freight cars over time, with limited substitution and equitable benefits[J]. Transportation Research Part B, 1985, 19(2): 85-94.
[9] HOLMBERGK, JOBORN M, et al. Improved empty freight car distribution[J]. Transportation Science, 1998, 32(2): 163-173.
[10] JOBORN M, CRAINIC T G, et al. Economies of scale in empty freight car distributionin scheduled railways[J]. Transportation Science, 2004, 38(2): 121-134.
[11] HAGHANU A. Formulation and solution of a combined train routing and makeup, and empty car distribution model[J]. Transportation Research Part B, 1989, 23(6): 433-452.
[12] ANDERSEN J, CRAINIC T G, CHRISTIANSEN M. Service network design with management and coordination of multiple fleets[J]. European Journal of Operational Research, 2009, 193(2): 377-389.
[13] 王保华, 何世伟. 考虑车辆周转的铁路动态货运服务网络设计优化模型及其分支-定价-切割算法 [J]. 铁道学报, 2018, 40(2): 8-14. [WANG B H, HE S W. Optimization model and branch- price- cut algorithm for design of railway dynamic freight service network considering rolling stock management[J]. Journal of the China Railway Society, 2018, 40(2): 8-14.]
[14] JHA K C, AHUJA R K, SAHIN G. New approaches for solving the block- to- train assignment problem[J]. Networks, 2008, 51(1): 48-62. |