[1] Petersen E R. Railyard modeling: part 1 prediction of put-through times[J]. Transportation Science, 1977, 2(1): 37-49.
[2] Turnquist M A, Daskin M S. Queueing model of classification and connection delay in railyard[J]. Transportation Science, 1982, 5(1): 207-230.
[3] 毛保华,张国伍. 编组站出发策略系统分析[J]. 铁道学 报, 1987(2): 207-229. [MAO B H, ZHANG G W. Analysis on the departure strategy in marshalling yard[J]. Journal of the China Railway Society, 1987(2): 207-229.]
[4] 王如义,王慈光. 编组站自编始发货物列车定点发车 模式的适应性研宄[J]. 北京工业大学学报, 2011, 37 (4): 541-546. [WANG R Y, WANG C G. Adaptability study of fixed-point departure mode of originated freight trains in railway marshalling stations[J]. Journal of Beijing University of Technology, 2011, 37(4):541-546.]
[5] 李夏苗. 技术站列车出发策略的经济性分析[J]. 中国 铁道科学,2001,22(2): 79-87. [LI X M. Economical efficiency analysis on the train departure strategy in technical station[J]. China Railway Science, 2001, 22(2): 79-87.]
[6] 李建文. 铁路编组站货车集结模式的研究[J]. 铁道运 输与经济, 2004, 26(3): 65-68. [LI J W. The study on the accumulation modes in marshalling yard[J]. Railway Transport and Economy. 2004, 26(3): 65-68.]
[7] 刘晨, 孙晚华. 放宽条件定点集结模式下编组站车列 解体顺序优化研宄[J]. 铁道学报, 2012, 34(2): 88-92. [LIU C, SUN W H. Research on optimization of sorting sequence of marshalling station trains in the time fixed assembly mode with softened terms[J]. Journal of the China Railway Society, 2012, 34(2): 88-92.]
[8] 陶德高,方文俞. 编组站双溜放驼峰到达解体系统模 拟分析法的研究[J]. 中国铁道科学,1991(1): 93-102. [TAO D G, FANG W Y. Research on receiving yard of marshalling station with two humps[J]. China Railway Science, 1991(1): 93-102.]
[9] 胡思继. 指标分析理论与铁路运营指标分析[M]. 北 京:中国铁道出版社,2010. [HU S J. Analysis theory and railway operation analysis indicators[M]. Beijing: China Railway Press, 2010.]
[10] 中华人民共和国住房和城乡建设部,中华人民共和国 国家发展和改革委员会,中华人民共和国铁道部. 铁 路建设项目经济评价方法与参数(第一版)[M]. 北京: 中国计划出版社, 2012. [PRC M C, NATIONAL D R C, CHINA R M. Railway construction project economic evaluation method and parameters (the first edition)[M]. Beijing: China Planning Press, 2012.] |