[1] DICKERSON C L, WANG J, WITHERSPOON J, et al. Work zone management in the district of Columbia: deploying a citywide transportation management plan and work zone project management system[J]. Transportation Research Record, 2016(2554): 37-45.
[2] MENG Q, WENG J. Optimal subwork zone length and project start time for short-term daytime work zones from the contractor’s perspective[J]. Transportation Research Part C: Emerging Technologies, 2013(29): 72- 83.
[3] LI Y, ZHAO Z, LI P, et al. Review of traffic signal control methods under over-saturated condition[J]. Journal of Traffic and Transportation Engineering, 2013, 13(4): 116-126.
[4] WENG J, MENG Q. Estimating capacity and traffic delay in work zones: an overview[J]. Transportation Research Part C: Emerging Technologies, 2013, 35(9): 34-45.
[5] FEI L, ZHU H, HAN X. Analysis of traffic congestion induced by the work zone[J]. Physica A: Statistical Mechanics and its Applications, 2016(450): 497-505.
[6] LI Y, CHEN K, GUO X. Impact of stretching-segment on saturated flow rate of signalized intersection using cellular automation[J]. Journal of Central South University, 2013, 20(10): 2887-2896.
[7] 王东炜, 袁聚亮, 方佳, 等. 基于系统可靠度的地铁站点施工交通影响分析[J]. 交通运输系统工程与信息, 2014, 14(2): 121- 126. [WANG D W, YUAN J L, FANG J, et al. Traffic impact analysis during the subway station construction based on the system reliability[J]. Journal of Transportation System Engineering and Information Technology, 2014, 14(2): 121-126.]
[8] MENG Q, WENG J. An improved cellular automata model for heterogeneous work zone traffic[J]. Transportation Research Part C: Emerging Technologies, 2011, 19(6): 1263-1275.
[9] JIANG X, ADELI H. Freeway work zone traffic delay and cost optimization model[J]. Journal of Transportation Engineering, 2003, 129(3): 230-241.
[10] ZHU W, LI Z, ASH J, et al. Capacity modeling and control optimization for two-lane highway lane closure work zones[C]. Transportation Research Board 95th Annual Meeting, Washington DC, Transportation Research Board, 2016.
[11] SCHONFELD P, CHIEN S. Optimal work zone lengths for two-lane highways[J]. Journal of Transportation Engineering, 1999, 125(1): 21-29.
[12] LIN P, KANG K, CHANG G. Exploring the effectiveness of variable speed limit controls on highway work-zone operations[J]. Journal of Intelligent Transportation Systems, 2004, 8(3): 155-168.
[13] ZHANG L, SKIBNIEWSKI M J, WU X, et al. A probabilistic approach for safety risk analysis in metro construction[J]. Safety Science, 2014(63): 8-17.
[14] SILVANO A P, BANG K L. Impact of speed limits and road characteristics on free- flow speed in urban areas[J]. Journal of Transportation Engineering, 2016, 142(2): 04015039-1-9.
[15] WENG J, MENG Q. Incorporating work zone configuration factors into speed-flow and capacity models[J]. Journal of Advanced Transportation, 2015, 49 (3): 371-384.
[16] UCHIDA K. Estimating the value of travel time and of travel time reliability in road networks[J]. Transportation Research Part B: Methodological, 2014(66): 129-147. 256 |