[1] GOVERDE R M P. A delay propagation algorithm for large-scale railway traffic networks[J]. Transportation Research Part C: Emerging Technologies, 2010, 18(3): 269-287.
[2] KROON L, MARÓTI G, HELMRICH M R, et al. Stochastic improvement of cyclic railway timetables[J]. Transportation Research Part B: Methodological, 2008, 42(6): 553-570.
[3] ANDERSSON E V, PETERSON A, TÖRNQUIST J. Quantifying railway timetable robustness in critical points[J]. Journal of Rail Transport Planning & Management, 2014, 3(3): 95-110.
[4] ANDERSSON E V, PETERSON A, TÖRNQUIST J. Reduced railway traffic delays using a MILP approach to increase Robustness in Critical Points[J]. Journal of Rail Transport Planning & Management, 2015, 5(3): 110-127.
[5] BURDETT R L, KOZAN E. Performance profiling for predictive train schedules[J]. Journal of Rail Transport Planning & Management, 2014, 4(4): 98-114.
[6] 李智, 张琦, 袁志明. 基于换乘最优的城市圈城际铁路运行图研究[J]. 交通运输系统工程与信息, 2015, 15 (3): 114- 119, 139. [LI Z, ZHANG Q, YUAN Z M. Optimal transfer of intercity railway train diagram[J]. Journal of Transportation Systems Engineering and Information Technology, 2015, 15(3): 114-119, 139.]
[7] CAIMI G, KROON L, LIEBCHEN C. Models for railway timetable optimization: Applicability and applications in practice[J]. Journal of Rail Transport Planning & Management, 2017, 6(6): 285-312.
[8] 杨浩. 铁路运输组织学[M]. 北京: 中国铁道出版社, 2015. [YANG H. Railway transport organization[M]. Beijing: China Railway Publishing House, 2015.]
[9] LEE Y, LU L, WU M, et al. Balance of efficiency and robustness in passenger railway timetables[J]. Transportation Research Part B: Methodological, 2017 (97): 142-156.
[10] VROMANS M, DEKKER R, KROON L. Reliability and heterogeneity of railway services[J]. European Journal of Operational Research, 2006, 172(2): 647-665.
[11] GOVERDE R M P. Railway timetable stability analysis using max-plus system theory[J]. Transportation Research Part B: Methodological, 2007, 41(2): 179-201.
[12] 谢美全, 聂磊. 周期性列车运行图编制模型研究[J]. 铁道学报, 2009, 31(4): 7-13. [XIE M Q, NIE L. Model of cyclic train timetable[J]. Journal of the China Railway Society, 2009, 31(4): 7-13.]
[13] BURGGRAEVE S, VANSTEENWEGEN P. Robust routing and timetabling in complex railway stations[J]. Transportation Research Part B: Methodological, 2017 (101): 228-244.
[14] 高鸿业. 西方经济学(微观部分)第五版[M]. 北京: 中国人民大学出版社, 2010. [GAO H Y. Microeconomics fifth edition[M]: Beijing: China Renmin University Press, 2010.]
[15] 查伟雄, 熊桂林. 列车区间运行时分动态特性研究[J]. 系统工程, 2001, 19(1): 47-51. [ZHA W X, XIONG G L. Study on the dynamic performance of the train running time in the scetion[J]. Systems Engineering, 2001,19(1): 47-51.]
[16] 赵宇刚, 毛保华, 蒋玉琨. 基于列车运行时间偏离的地铁列车运行图缓冲时间研究[J]. 中国铁道科学, 2011, 32(1): 118-121. [ZHAO Y G, MAO B H, JIANG Y K. Study on the buffer time of metro train diagram based on train running time deviation[J]. China Railway Science, 2011, 32(1): 118-121.]
[17] 铁道部. 新建时速300-350公里客运专线铁路设计暂行规定[M]. 北京: 中国铁道出版社, 2007. [Ministry of Railways. Provisional regulations on the design of passenger dedicated railway with speed of 300-350 km/h [M]. Beijing: China Railway Publishing House, 2007.] |