[1] GHAEMI N, CATS O, GOVERDE R M P. Macroscopic
multiple-station short-turning model in case of complete
railway blockages[J]. Transportation Research Part C:
Emerging Technologies, 2018, 89: 113-132.
[2] ZHU Y Q, GOVERDE R M P. Railway timetable
rescheduling with flexible stopping and flexible short
turning during disruptions[J]. Transportation Research
Part B: Methodological, 2019, 123: 149-181.
[3]王义惠,赵康祺,王航宇,等.地铁线路双向中断时长不确定下的列车运行调整[J].中国铁道科学,2023,44
(4): 230-240. [WANG Y H, ZHANG K Q, WANG H
Y, et al. Train rescheduling under bi-directional
interruption with uncertain duration of a metro line[J].
China Railway Science, 2023, 44(4): 230-240.]
[4]徐培娟,牛瑜巍,秦阳,等.地铁列车运行与车底周转
计划同步实时调整方法[J]. 铁道科学与工程学报,
2023, 20(12): 4517-4528. [XU P J, NIU Y W, QING Y,
et al. Metro trains rescheduling method involving the
rolling stocks rescheduling problem[J]. Journal of
Railway Science and Engineering, 2023, 20(12): 4517
4528.]
[5] YIN J T, YANG L X, D'ARIANO A, et al. Integrated
backup rolling stock allocation and timetable
rescheduling with uncertain time-variant passenger
demand under disruptive events[J]. Informs Journal on
Computing, 2022, 34: 3234-3258.
[6]
SU B Y, D'ARIANO A, SU S, et al. Integrated train
timetabling and rolling stock rescheduling for a disturbed
metro system: A hybrid deep reinforcement learning and
adaptive large neighborhood search approach[J].
Computers & Industrial Engineering , 2023, 186:
109742.
[7] WANG Y H, ZHAO K Q, D'ARIANO A, et al. Real-time
integrated
train
rescheduling and rolling stock
circulation planning for a metro line under disruptions[J].
Transportation Research Part B: Methodological, 2021,
152: 87-117.
[8]张翕然,陈绍宽,赵兴东,等.跨线运营模式下地铁列车运行图调整优化方法[J].交通运输系统工程与信息, 2023, 23(4): 164-174. [ZHANG X R, CHEN S K,
ZHAO X D, et al. A rescheduling optimization method
for metro trains under cross-line operation[J]. Journal of
Transportation Systems Engineering and Information
Technology, 2023, 23(4): 164-174.]
[9]
徐培娟,张大伟,彭辉,等.多类干扰下的高铁列车运行调整优化模型[J]. 铁道科学与工程学报,2021,18
(7): 1723-1731. [XU P J, ZHANG D W, PENG H, et al.
Trains rescheduling for high-speed railway under the
influence of multi-disturbances[J]. Journal of Railway
Science and Engineering, 2021, 18(7): 1723-1731.]
[10] ZHU Y Q, GOVERDE R M P. Dynamic railway timetable
rescheduling for multiple connected disruptions[J].
Transportation Research Part C: Emerging Technologies,
2021, 125: 103080.
[11] 邓念, 彭其渊,占曙光.干扰条件下高速铁路列车运行实时调整问题研究[J]. 交通运输系统工程与信息,
2017, 17(4): 118-123. [DENG N, PENG Q Y, ZHAN S
G. Real-time train rescheduling on high-speed railway
under disruption condition[J]. Journal of Transportation
Systems Engineering and Information Technology, 2017,
17(4): 118-123.]
|