[1] 何华武, 洪雁, 马健, 等. 中国铁路“走出去”投融资模式研究[J]. 中国工程科学, 2017, 19(5): 27-32. [HE H
W, HONG Y, MA J, et al. Research on the investment
and financing mode of China railway's“Go Global”
strategy[J]. Strategic Study of CAE, 2017, 19(5): 27-32.]
[2] 陈春阳, 宇德明. 中国铁路“走出去”风险管控研究[J].
中国工程科学, 2017, 19(5): 62-67. [CHEN C Y, YU D
M. Risk management and controlling measures utilized
during implementation of China railway's“Go Global”
strategy[J]. Strategic Study of CAE, 2017, 19(5): 62-67.]
[3] AMEYAW E E, CHAN A P C. Evaluation and ranking of
risk factors in public-private partnership water supply
projects in developing countries using fuzzy synthetic
evaluation approach[J]. Expert Systems with
Applications, 2015, 42(12): 5102-5116.
[4] AN M, QIN Y, JIA L M, et al. Aggregation of group fuzzy
risk information in the railway risk decision making
process[J]. Safety Science, 2016, 82: 18-28.
[5] 金晶, 朱亮, 李宗昊, 等. 基于结构优化BP神经网络的铁路“走出去”目标国宏观风险评估模型研究[J].铁道学报, 2018, 40(12): 7-12. [JIN J, ZHU L, LI Z H, et al.
Application of variable structure of BPNN in risk
evaluation of overseas railway construction in target
countries[J]. Journal of the China Railway Society, 2018,
40(12): 7-12.]
[6] 唐文彬, 张飞涟, 李晶晶. 基于模糊网络分析法的城际铁路建设项目风险评价研究[J]. 铁道科学与工程学报, 2011, 8(4): 68-73. [TANG W B, ZHANG F L, LI
J J. Research on risk evaluation in inter-city railway
construction project based on fuzzy analytic network
process[J]. Journal of Railway Science and Engineering,
2011, 8(4): 68-73.]
[7] 吕敏, 帅斌, 周照玉, 等. 考虑边境站延误风险的中欧班列运输路径决策[J]. 交通运输系统工程与信息,
2021, 21(3): 254-259. [LV M, SHUAI B, ZHOU Z Y,
et al. Route decision-making of China railway express
considering border delay risk[J]. Journal of
Transportation Systems Engineering and Information
Technology, 2021, 21(3): 254-259.]
[8] 潘琰, 毛腾飞. 基于变权可拓物元和证据理论的收费公路 PPP 项目风险预警[J]. 交通运输系统工程与信息, 2018, 18(5): 5- 11. [PAN Y, MAO T F. Toll road
PPP project risk early warning based on variable
weight extension matter-element and evidence theories
[J]. Journal of Transportation Systems Engineering and
Information Technology, 2018, 18(5): 5-11.]
[9] TVERSKY A, KAHNEMAN D. Advances in prospect
theory: Cumulative representation of uncertainty[J].
Journal of Risk and Uncertainty, 1992, 5(4): 297-323.
[10] 彭引. 基于PPP模式的铁路项目风险评价和风险分担研究 [D]. 成都: 西南交通大学, 2019. [PENG Y.
Research on risk assessment and risk sharing of railway
projects based on PPP mode[D]. Chengdu: Southwest
Jiaotong University, 2019.]
[11] 常建鹏, 陈振颂, 周国华, 等. 基于前景理论的铁路应急预案多指标风险评估研究[J]. 铁道学报, 2016, 38
(2): 7-18. [CHANG J P, CHEN Z S, ZHOU G H, et al.
The multi-index risk evaluation of railway emergency
plans based on prospect theory[J]. Journal of the China
Railway Society, 2016, 38(2): 7-18.]
|