[1]Shen Y, Xia J. Integrated bus transit scheduling for the Beijing bus group based on a unified mode of operation[J]. International Transactions in Operational Research, 2009, 16(2): 227-242.
[2]沈吟东,倪郁东. 基于禁忌搜索的公交调度计划系统[J]. 城市公共交通, 2006(9): 34-39. [SHEN Y D,NI Y D. A public transport scheduling system based on tabu search [J]. Urban Public Transport, 2006(9): 34-39.]
[3]Salicrú M, Fleurent C, Armengol J M. Timetablebased operation in urban transport: Runtime optimisation and improvements in the operating process[J]. Transportation Research Part A: Policy and Practice, 2011, 45(8): 721-740.
[4]Carey M.Reliability of interconnected scheduled services[J]. European Journal of Operational Research, 1994, 79(1): 51-72.
[5]Dessouky M,Hall R,Nowroozi A,et al.Bus dispatching at timed transfer transit stations using bus tracking technology[J]. Transportation Research Part C: Emerging Technologies, 1999, 7(4): 187-208.
[6]Zhao J, Dessouky M, Bukkapatnam S. Optimal slack time for schedulebased transit operations[J]. Transportation Science, 2006, 40(4): 529-539.
[7]Furth P G,Hemily B,Muller T H J,et al.Using archived AVLAPC data to improve transit performance and management[J]. TCRP Report, 2006(113): 91p.
[8]Rao B V,Feldman R M.Approximations and bounds for the variance of steadystate waiting times in a GI/G/1 queue[J]. Operations Research Letters, 2001, 28(2): 51-62.
[9]Ceder A.Public transit planning and operation:theory,modeling,and practice[M].ButterworthHeinemann, 2007. |