[1] ZHOU F, SHI J G, PAN H C. Optimization method for last train coordination plan of urban rail transit based on network operation[J]. Procedia- Social and Behavioral Sciences, 2013, 96:2706-2712.
[2] 徐瑞华,张铭,江志彬,等.基于线网运营协调的城市 轨道交通首末班列车发车时间域研究[J]. 铁道学报, 2008, 30(2): 7-11. [XU R H, ZHANG M, JIANG Z B, et al. Study on departure time domain of the first and last trains of urban mass transit network based on operation coordination[J]. Journal of the China Railway Society, 2008, 30(2): 7-11. ]
[3] 徐瑞华,李璇. 城市轨道交通网络末班车衔接方案 的综合优化[J]. 同济大学学报(自然科学版), 2012, 40(10):1510- 1516. [XU R H, LI X. Comprehensive optimization for connection scheme of last trains in urban mass transit network[J]. Journal of Tongji University(Natural Science) , 2012, 40(10):1510-1516.]
[4] KANG L J, WU J J, SUN H J, et al. A case study on the coordination of last trains for the Beijing subway network[J]. Transportation Research Part B, 2015, 72 (72):112-127.]
[5] ZHOU W L, DENG L B, XIE M Q. Coordination optimization of the first and last trains' departure time on urban rail transit network[J]. Advances in Mechanical Engineering, 2013(2013):12.
[6] KANG L J, ZHU X N. A simulated annealing algorithm for first train transfer problem in urban railway networks[J]. Applied Mathematical Modelling, 2015.
[7] WONG C W, YUEN W Y, FUNG K W, et al. Optimizing timetable synchronization for rail mass transit[J]. Transportation Science, 2008, 42(1):57-69. |