[1] 叶苏东. BOT模式开发城市轨道交通项目的补偿机制研究[J]. 北京交通大学学报(社会科学版), 2012, 4 (11): 22-29. [YE S D. Study on the subsidizing system of urban railway transport project under BOT model[J]. Journal of Beijing Jiaotong University Social Sciences Edition, 2012, 4(11): 22-29.]
[2] 吴孝灵, 周晶, 彭以忱, 等. 基于公私博弈的PPP 项目政府补偿机制研究[J]. 中国管理科学, 2013(21): 198- 204. [WU X L, ZHOU J, PENG Y C, et al. Government’s compensation mechanism for PPP project based on game between public and private sector[J]. Chinese Journal of Management Science, 2013(21): 198- 204.]
[3] 田振清. 城市轨道交通运营补贴模式及参数研究[J]. 交通运输系统工程与信息, 2010, 10(1): 33- 37. [TIAN Z Q. On mode with parameters of operational subsidy of urban rail transit[J]. Journal of Transportation Systems Engineering and Information Technology, 2010, 10(1): 33-37.]
[4] MOURAVIEV N, KAKABADSE N, ROBINSON I. Concessionary nature of public-private partnerships in Russia and Kazakhstan: A critical review[J]. International Journal of Public Administration, 2012 (35): 410-420.
[5] 吕俊娜. 不确定收益下交通BOT项目特许期决策模型研究[D]. 重庆:重庆大学,2014. [LV J N. Research on decision-making model on concession period for BOT transportation project under uncertain revenue[D]. Chongqing: Chongqing University, 2014.]
[6] FENMAY LIOU, CHIHPIN HUANG, BORLIANG CHEN. Model government subsidies and project risk for finacially non-viable build-operate-transfer (BOT) project[J]. Engineering Management Journal, 2012, 1 (24): 58-64.
[7] 胡振, 王秀婧, 刘华. 购买型公司合作(PPP)项目财政补偿的有效区间研究[J]. 建筑经济,2013(3): 93-96. [HU Z, WANG X J, LIU H. Study on available compensation field of PPP project[J]. Construction Economics, 2013(3): 93-96.]
[8] SHA ZHENG, ROBERT L, TIONG K. First publicpartnership application in taiwan’ s wastewater treatment sector: Case study of nanzih BOT wastewater treatment projet[J]. Journal of Construction Engineering and Management, 2010, 136(8): 913-922.
[9] 黄智星, 申金升, 王传涛. PPP模式下的城市轨道交通项目投资策略研究[J]. 交通运输系统工程与信息, 2016, 16 (2): 14-18. [HUANG Z X, SHEN J S, WANG C T. Project investment in the field of urban rail transit under the PPP mode[J]. Journal of Transportation System Engineering and Information Technology, 2016, 16 (2): 14-18.]
[10] SHI S S, YIN Y F, GUO X L. Optimal choice of capacity, toll and government guarantee for buildoperate- transfer roads under asymmetric cost information[J]. Transportation Research Part B, 2016 (86): 56-69.
[11] HANAOKA S, PALAPUS H P. Reasonable concessionperiod for build- operate- transfer road projects in the philippines[J]. International Journal of Project Management, 2012, 30(8): 938-949.
[12] WU M, CHAU K W, SHEN Q P, et al. Net asset valuebased concession duration model for BOT contracts[J]. Journal of Construction Engineering and Management, 2012, 138(2): 304-308.
[13] THOMAS NG S, XIE J Z, CHEUNG Y K, et al. A simulation model for optimizing the concession period of public-private partnerships schemes[J]. International Journal of Project Management, 2007(25): 792-793.
[14] 张庆娟. 城市轨道交通成本构成分析:以北京地铁4 号线为例[D]. 北京:北京交通大学, 2010. [ZHANG Q J. The analysis on cost of urban rail transit: with example of Beijing subway line 4[D]. Beijing: Beijing Jiaotong University, 2010.
[15] 高永玲,杨浩,孙强. 城市轨道交通项目建设实际选择的实物期权随机变量模型[J]. 铁道学报, 2008, 6 (30): 15-18. [GAO Y L, YANG H, SUN Q. A real option model with stochastic variables of construction timing selection of urban rail transit projects[J]. Journal of the China Railway Society, 2008, 6(30): 15-18.] |