[1] 陈春妹,任福田,荣建.路网容量研究综述[J].公路交通科技,2002,19(3): 97-101.[CHEN Chun-mei, REN Fu-tian, RONG Jian, Review of road network capacity[J], Journal of Highway and Transportation Research and Development. 2002, 19(3): 97-101.] [2] Akamatsu T., Miyawaki O.Maximum network capacity problem under the transportation equilibrium assignment[J], Infrastructure Planning Review, 1995, 12: 719-729. [3] Asakura Y., Maximum capacity of road network constrained by user equilibrium conditions[C]//, The Proceeding of 24th Annual Conferrence of the UTSG, 1992. [4] Asakura Y., Kashiwadani M., Estimation model of maximum road network capacity with parking constraints and its application[J], Infrastructure Planning Review, 1993, 11: 129-136. [5] Yang H., Bell G H., Meng Q., Modeling the capacity and level of service of urban transportation networks[J], Transportation Research Part B, 2000, 34: 255-245. [6] Wong S. C, Yang H. Reserve capacity of signal-controlled road network[J], Transportation Research Part B, 1997, 31: 397-402. [7] Gao Z. Y, Song Y F, A reserve capacity model of optimal signal control with user-equilibrium route choice[J], Transportation Research Part B, 2002, 36: 313-323. [8] Chen A, Yang H, William L H K., Capacity reliability of road network: an assessment methodology and numerical results[J], Transportation Research Part B, 2002, 36:225-252. [9] Yang H, Bell M G H. A capacity paradox in network designing and how to avoid it[J], Transportation Research Part B, 1998, 32(7):539-545. [10] Nie Y, Zhang H M., Lee D H, Models and algorithms for the traffic assignment problem with link capacity constraints[J], Transportation Research Part B, 2004, 38: 285-312. [11] Sheffi, Y. Urban Transportation Network: Equilibrium Analysis with Mathematical Programming Methods[M], Prentice-Hall, Englewood Cliffs, NJ. 1985. |