[1]Maoti G. Operations research models for railway rolling stock planning[D]. Eindhoven, Technische Universiteit Eindhoven, 2006. [2]Peeters M, Kroon L, et al. Circulation of railway rolling stock: a branch-and-price approach[J] .Computers & Operational Research, 2008, 35(2): 538-556. [3]Alfieri A, Rutger G, Kroon L, et al. Efficient circulation of railway rolling stock[J]. Transportation Science, 2006, 40(3): 378-391. [4]Maoti G, Kroon L. Maintenance routing for train units: the transition model[J]. Transportation Science, 2005, 39(4): 518-525. [5]Maoti G, Kroon L. Maintenance routing for train units: the interchange model[J]. Computers & Operational Research, 2007, 34(4): 1121-1140. [6]赵鹏. 高速铁路动车组和乘务员运用的研究[D]. 北京: 北方交通大学, 1998.[ZHAO P. Study on motor train-set and stuff operation in high speed railway[D]. Beijing: Northern Jiaotong University, 1998.] [7]吴敌. 基于运用的客运专线动车组检修体制的研究[D]. 北京: 北京交通大学, 2006.[WU D. The research of train-set examination and repair system based on operation[D]. Beijing: Beijing Jiaotong University, 2006.] [8]赵鹏, 杨浩, 胡安洲. 高速铁路动车组不固定区段使用问题[J]. 铁道学报, 1997, 19(2): 15-20.[ZHAO P, YANG H, HU A Z. Research on usage of high-speed passenger trains on uncertain railroad research[J]. Journal of the China Railway Society, 1997, 19(2): 15-20.] [9]兰淑梅.京沪高速铁路客车开行方案有关问题的研究[J]. 铁道运输与经济, 2002, 24(5): 32-34.[LAN S M. Study on the relevant issues of train running program along Beijing-Shanghai high speed line[J]. Railway Transport and Economy, 2002, 24(5): 32-34.] [10]聂磊, 赵鹏, 杨浩, 等. 高速铁路动车组运用的研究[J]. 铁道学报, 2001, 23(3): 1-7.[NIE L, ZHAO P, YANG H, et al. Study on motor train-set operation in high speed railway[J]. Journal of the China Railway Society, 2001, 23(3): 1-7.] [11]赵鹏,富井规雄.基于概率局域搜索的动车组平日运用计划编制算法[J].系统工程理论与实践, 2004, 24(2): 123-129.[ZHAO P, Tommi N. An algorithm for train-set scheduling on weekday based on probabilistic local search[J]. System Engineering-Theory & Practice, 2004, 24(2): 123-129.] [12]赵鹏, 富井规雄. 基于路段交换的多基地动车组运用计划的编制算法[J]. 铁道学报, 2004, 26(1): 7-11.[ZHAO P, Tommi N. An algorithm for multi-basestrain-set scheduling based on path-exchange[J]. Journal of the China Railway Society, 2004, 26(1): 7-11.] [13]佟璐, 聂磊, 赵鹏. 蚁群算法在动车组运用问题中的应用[J].交通运输系统工程与信息, 2009, 9(6): 161-167.[TONG L, NIE L, ZHAO P. Application of ant colony algorithm in train-set scheduling problem[J]. Journal of Transportation Systems Engineering and Information Technology, 2009, 9(6): 161-167.] [14]毛保华, 王保山, 徐斌, 等. 我国铁路列车运行计划集成编制方法研究[J]. 交通运输系统工程与信息, 2009, 9(2): 27-37.[MAO B H, WANG B S, XU B, et al. On integrated train operational scheme drawing-up platform of China[J]. Journal of Transportation Systems Engineering and Information Technology, 2009, 9(2): 27-37.] [15]赵鹏, 张迦南. 铁路动车组的运用问题研究[J]. 北京交通大学学报, 2009, 33(3): 6-10.[ZHAO P, ZHANG J N. Review of railway train-set routing problem[J]. Journal of Beijing Jiaotong University, 2009, 33(3): 6-10.] |