[1] 郑建东. 成都北站组号数量对驼峰解体能力的影响分 析[J]. 铁道运输与经济, 2013, 35(6): 43-45. [ZHENG J D. Analysis on influence of group indication number in Chengdu North Station on hump uncoupling capacity[J]. Railway Transport and Economy, 2013, 35(6): 43-45.]
[2] AHUJA R K, JHA K C, LIU J. Solving real-life railroad blocking problems[J]. Interfaces, 2007, 37(5): 404-419.
[3] YAGHINI M, FOROUGHI A, NADJARI B. Solving railroad blocking problem using ant colony optimization algorithm[J]. Applied Mathematical Modelling, 2011, 35 (12): 5579-5591.
[4] 纪丽君, 林柏梁, 乔国会, 等. 基于多商品流模型的铁 路网车流分配和径路优化模型[J]. 中国铁道科学, 2011, 32(3): 107-110. [JI L J, LIN B L, QIAO G H, et al. Car flow assignment and routing optimization mode of railway network based on multi-commodity flow model[J]. China Railway Science, 2011, 32(3): 107- 110.]
[5] 王保华, 何世伟. 铁路车流改编方案随机优化模型 及其算法[J]. 中国铁道科学, 2009, 30(5): 104-108. [WANG B H, HE S W. Stochastic optimization model and algorithm for railway wagon flow reorganization[J]. China Railway Science, 2009, 30(5):104-108.]
[6] 陈东,吴柏青,高四维. 编组站智能调车指挥系统的构 建及实现[J]. 铁道运输与经济, 2008, 30(4): 34-37. [CHEN D, WU B Q, GAO S W. Establishment and realization of intelligent shunting control system in marshalling station[J]. Railway Transport and Economy, 2008, 30(4): 34-37.]
[7] ALUMUR S A, YAMAN H, KARA B Y. Hierarchical multimodal hub location problem with time-definite deliveries[J]. Transportation Research Part E: Logistics and Transportation Review, 2012, 48(6): 1107-1120.
[8] VAMANAN M, WANG Q, BATTA R, et al. Integration of COTS software products ARENA & CPLEX for an inventory/logistics problem[J]. Computers & Operations Research, 2004, 31(4): 533-547. 128 |