[1]钱丽芳, 谭喜堂, 申朝旭. 北京地铁1号线运能现状及提高措施[J]. 城市轨道交通研究, 2012, 15(2): 69-73. [QIAN L F, TAN X T, SHEN Z X. Present situation of the transport capacity on Beijing Metro Line 1 and improving measures [J]. Urban Mass Transit, 2012, 15(2): 69-73.]
[2]王志海. 轨道交通终点站折返能力分析及改进研究[J]. 城市轨道交通研究, 2012, 15(4): 86-89. [WANG Z H. Analysis and improvement of the turnback capacity at rail transit terminal[J]. Urban Mass Transit, 2012, 15(4): 86-89.]
[3]赵晓丽, 蔡林沁. 天津地铁4号线扩能方案比较与分析[J]. 铁路工程造价管理, 2011, 26(5): 10-12. [ZHAO X L, CAI L Q. Comparison and analysis of Tianjin Metro Line 4 revamping schemes[J]. Railway Engineering Cost Management, 2011, 26(5): 10-12.]
[4]付印平, 高自友, 李克平. 基于元胞自动机模型的地铁列车追踪运行研究[J]. 交通运输系统工程与信息, 2008, 8(4): 89-95. [FU Y P, GAO Z Y, LI K P. Modeling study for tracking operation of subway trains based on cellular automata [J]. Journal of Transportation Systems Engineering and Information Technology, 2008, 8(4): 89-95.] |