[1] 中华人民共和国铁道部. 铁路驼峰及调车场设计规范[S]. 中国铁道出版社, 1999, 北京. [Ministry of Railways, PRC. Code for design on hump and marshalling yard of railway[S]. China Railway Publishing House, 1999, Beijing.]
[2] 尹红, 张觉印. 驼峰设计气象资料的收集和选用方法的研究[J]. 中国铁道科学, 1999, 20(1):52-58. [YIN H, ZHANG J Y. Study on the method of collecting and selecting meteorological data in hump design[J]. China Railway Science, 1999, 20(1):52-58.]
[3] 张红亮, 杨浩, 张超, 等. 驼峰车组溜放的动态出口定速模型研究[J]. 交通运输系统工程与信息, 2010, 10(4):161-165. [ZHANG H L, YANG H, ZHANG C, et al. Dynamic exit speed-control model of hump skating[J]. Journal of Transportation Systems Engineering and Information Technology, 2010, 10(4):161-165.]
[4] 田亚明, 林柏梁, 王志美. 考虑始发直达比重的编组站改编能力优化模型[J]. 交通运输系统工程与信息, 2011, 11(3):65-70. [TIAN Y M, LIN B L,WANG Z M. Optimization model for resorting capacity of marshalling station under considering proportion of direct trains[J]. Journal of Transportation Systems Engineering and Information Technology, 2011, 11(3):65-70.]
[5] 黎浩东, 何世伟, 宋瑞, 等. 编组站阶段计划随机相关机会规划模型及算法[J]. 交通运输系统工程与信息, 2010, 10(1):128-133. [LI H D, HE S W, SONG R, et al. Stochastic dependent chance programming model and algorithm for stage plan of marshalling station[J]. Journal of Transportation Systems Engineering and Information Technology, 2010, 10(1):128-133.]
[6] 中国气象科学数据共享服务网. 气象资料数据库[OL], http://cdc.cma.gov.cn/home.do (2014/5/18) [2014/5/18]. [China Meteorological Data Sharing Service System. Meteorological information databases [OL] [http: //cdc.cma.gov.cn/home.do. (2014/5/18) [2014/5/18].]
[7] 王海军, 涂诗玉, 陈正洪. 日气温数据缺测的插补方法试验与误差分析[J]. 气象. 34(7):83-91. [WANG H J, TU S Y, CHEN Z H. Interpolating method for missing data of daily air temperature and its error analysis[J]. Meteorological Monthly. 34(7):83-91.] |