[1] 国务院.“十二五”综合交通运输体系规划[R]. 北京, 2012. [State Council. The twelfth five-year plan of the integrated transport system[R]. Beijing, 2012.]
[2] 秦灿灿, 徐循初. 法兰克福机场的空铁联运[J]. 交通与 运输, 2005(2): 46-49. [QIN C C, XU X C. On air-rail intermodality in Frankfurt airport[J]. Traffic & Transportation, 2005(2): 46-49.]
[3] 张旭. 高速铁路与民航客运竞争及协同发展研究[D]. 大连: 大连海事大学, 2012. [ZHANG X. Research on competition and collaborative development between HSR and civil aviation[D]. Dalian: Dalian Maritime University, 2012.]
[4] 黄璇. 铁路与航空旅客联合运输可行性研究[D]. 上 海: 同济大学, 2008. [HUANG X. Feasibility study on passenger transportation of air-rail integration[D]. Shanghai: Tongji University, 2008.]
[5] 杨年, 朱金福. 枢纽容量分配下的空铁联运网络 设计[J]. 交通信息与安全, 2012(1): 134-138. [YANG N, ZHU J F. Air-rail network design based on hub capacity allocation[J]. Journal of Transport Information and Safety, 2012(1): 134-138.]
[6] 关宏志. 非集计模型:交通行为分析的工具[M]. 北京: 人民交通出版社, 2004. [GUAN H Z. Disaggregate model: A tool of traffic behavior analysis[M]. Beijing: China Communication Press, 2004.]
[7] 刘志明, 邓卫, 郭唐仪. 基于RP/SP调查的非集计模型 在交通方式分担率预测的应用[J]. 交通运输工程与信 息学报, 2008, 6(3), 59-64. [LIU Z M, DENG W, GUO T Y. Application of disaggregate model based on RP/SP survey to transportation planning[J]. Journal of Transportation Engineering and Information, 2008, 6(3), 59-64.]
[8] Li Z C, Lam W H K, Wong S C, et al. Optimal route allocation in a liberalizing airline market[J]. Transportation Research Part B: Methodological, 2010, 44(7): 886-902.
[9] Sheng D, Li Z C, Xiao Y B, et al. Slot auction in an airport network with demand uncertainty[J]. Transportation Research Part E: Logistics and Transportation Review, 2015(82): 79-100. |