[1] ABROAD I, MINKARAH I. Questionnaire survey on bidding in construction[J] Manage Eng. ASCE, 1998, 4(3): 229-243.
[2] FRIEDMAN L. A competitive-bidding strategy[J].Operation Research, 1956, 4(1): 104-112.
[3] CARR R I. General bidding model[J]. Journal of the Construction Division, 1982, 108(4): 639-651.
[4] SEYDEL J, OHON D. Bids considering multiplecriteria[J]. Consb. Engrg. Mgmt., ASCE, 1996,116(4): 609-632.
[5] 王键,李立增,马涛. 基于模糊综合评价的工程投标决策方法[J]. 国防交通工程与技术, 2005(3): 31-32.[WANG J, LI L Z, MA T. On project bidding decision
based on comprehensive fuzzy evaluation[J]. Traffic Engineering and Technology for National Defence, 2005(3): 31-32.
[6] 郝成,李静,李雪梅,等. 基于粗糙集的城市轨道交通项目效益因素多元组合权重研究[J]. 中国铁道科学,2008, 29(6): 121-125. [HAO C, LI J, LI X M, et al.
Research on the combination weight of multiple benefit factors in urban rail transit project based on rough set[J].China Railway Science, 2008, 29(6): 121-125.]
[7] 熊萍,程华斌,吴晓平. 基于粗糙集理论的一种综合定权法[J]. 海军工程大学学报, 2003, 15(1): 53- 56.[XIONG P, CHENG H B, WU X P. A synthetic weighting method based on rough sets[J]. Journal of Naval University of Engineering, 2003, 15(1): 53-56.] |