[1] 张军. 宁波港区锚地设置发展规划及锚地规划相关问题的探讨[D]. 大连: 大连海事大学, 2004. [ZHANG J. Study on the anchorage layout of Ningbo port and on the techniques of relevant to anchorage planning[D]. Dalian: Dalian Maritime University, 2004. ]
[2] 周明星, 周志丹. 关于内河港口锚地建设规模的研究[J].水运工程,1990(11): 20-27. [ZHOU M X, ZHOU Z D. Research on anchorage scale in inland harbour[J]. Port & Waterway Engineering, 1990(11): 20-27.]
[3] 张芳亮. 基于船舶交通模拟的港口锚位数需求量研究[D].大连:大连海事大学, 2012. [ZHANG F L. Research on the demand of the number of the anchorage base on traffic simulation[D]. Dalian: Dalian Maritime University, 2012. ]
[4] 王志刚. 港口航道系统调度优化与锚地规模仿真研究[D]. 天津: 天津大学,2011. [WANG Z G. Research on simulation of scheduling optimization and anchorage scale of port channel system[D]. Tianjing: Tianjing University, 2011.]
[5] 焦宇, 康与涛, 尹小贝. 港口交通资源承载力预测预警模型[J]. 交通运输工程学报, 2012(2): 84-92. [JIAO Y, KANG Y T, YIN X B. Forecasting and early-warning model of port traffic resource carrying capacity[J]. Journal of Traffic and Transportation Engineering, 2012 (2): 84-92.]
[6] 刘敬贤, 李昌伟, 刘文. 基于排队论的锚地规模论证分析[J]. 船海工程,2009(4): 158-161. [LIU J X, LI C W, LIU W. Anchorage scale analyzes based on the queuing theory[J]. Ship & Ocean Engineering, 2009(4): 158-161.]
[7] 贾松松. 基于排队论的港口最佳锚位数研究[D]. 大连: 大连海事大学, 2011. [JIA S S. Researeh on optimal number of anchorage for a port based on queueing theory[D]. Dalian: Dalian Maritime University, 2011.]
[8] 熊方方. M/M/l/N→M/M/c/K 排队系统及其在锚地中的应用研究[D]. 武汉: 武汉理工大学, 2010. [XIONG F F. M/M/l/N→M/M/c/K queueing system and its application in anchorage planning[D]. Wuhan: Wuhan University of Technology, 2010.]
[9] 张锡海. 基于排队论的岚山港大型油轮锚地容量评估[J]. 青岛远洋船员职业学院学报,2012(4): 5-8. [ZHANG X H. Based on the theory of queuing for the VLCC anchorage admeasurements assessment of Lanshan port[J]. Journal of Qingdao Ocean Shipping Mariners College, 2012(4): 5-8.]
[10] 张毅, 解中柱, 朱俊风. 三峡坝上待闸锚地建设规模探讨[J]. 水运工程,2013(3): 148-152. [ZHANG Y, XIE Z Z, ZHU J F. On scale of anchorage in front of Three Gorges dam[J]. Port & Waterway Engineering, 2013(3): 148-152.]
[11] ZRNI? D, DRAGOVI? B, RADMILOVI? Z. Anchorage-ship-berth Link as multiple server queueing system[J]. Journal of Waterway, Port, Coastal and Ocean Engineering, ASCE, 1999, 125(5): 232-240.
[12] JOVANOVI? S, OLIVELLA J, RADMILOVI? Z. Ship waiting time in a river port with priority servicing and limited anchorage area[J]. Maritime Heritage and Modern Ports, 2005(79): 301-309. |