[1] CHAKROBORTY P, VIKRAM D. Optimum assignment of trains to platforms under partial schedule compliance [J]. Transportation Research, Part B, 2008, 42(2): 0-184.
[2] CAPRARA A, GALLI L, TOTH P. Solution of the train platforming problem[J]. Transportation Science, 2011, 45 (2): 246-257.
[3] QI J G, YANG L X, GAO Y, et al. Integrated multi-track station layout design and train scheduling models on railway corridors[J]. Transportation Research Part C: Emerging Technologies, 2016, 69: 91-119.
[4] 彭其渊, 宁佳, 鲁工圆. 大型高铁客运站到发线运用调整 模 型 及 算 法 [J]. 铁 道 学 报, 2019, 41(1): 16- 25. [PENG Q Y, NING J, LU G Y. Model and algorithm for train platform scheme rescheduling at large high-speed railway station[J]. Journal of the China Railway Society, 2019, 41(1): 16-25.]
[5] LIU S Q, ERHAN K. Scheduling trains as a blocking parallel-machine job shop scheduling problem[J]. Computers and Operations Research, 2009, 36(10): 2840-2852.
[6] 白紫熙, 周磊山, 王劲, 等. 基于拉格朗日的高速铁路车站作业优化[J]. 交通运输系统工程与信息, 2014, 14 (4): 120-125. [BAI Z X, ZHOU L S, WANG J, et al. A Lagrangian relaxation model for high-speed railway station operation optimization[J]. Journal of Transportation Systems Engineering and Information Technology, 2014, 14(4): 120-125.]
[7] ARMSTRONG J, PRESTON J, POTTS C, et al. Addressing nodal constraints on the capacity of railways [J]. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 2017, 231(5): 637-646.
[8] LAMORGESE L, MANNINO C. An exact decomposition approach for the real-time train dispatching problem[J]. Operations Research, 2015, 63(1): 48-64.
[9] SAMA M, PELLEGRINI P, D' ARIANO A, et al. Ant colony optimization for the real-time train routing selection problem[J]. Transportation Research Part B: Methodological, 2016, 85: 89-108.
[10] 郭彬, 周磊山, 唐金金, 等. 高速铁路大站作业计划鲁棒性链式优化研究[J]. 铁道学报, 2017,39(7): 14-21. [GUO B, ZHOU L S, TANG J J, et al. Study on robustness improvement of high-speed railway station operation plan based on operational chain optimization [J]. Journal of the China Railway Society, 2017, 39(7): 14-21.]
[11] KUMAR R , SEN G, KAR S, et al. Station dispatching problem for a large terminal: A constraint programming approach[J]. Interfaces, 2018, 48(6): 510-528.
[12] LEE Y S, CHEN C Y. A heuristic for the train pathing and timetabling problem[J]. Transportation Research Part B: Methodological, 2009, 43(8/9): 837-851.
[13] 苗建瑞, 于勇, 孟令云, 等. 面向稳定性的高速铁路车站作业计划优化方法[J]. 交通运输系统工程与信息, 2012, 12(3): 115-121. [MIAO J R, YU Y, MENG L Y, et al. Stability- oriented optimization of train platforming problem on high speed railway[J]. Journal of Transportation Systems Engineering and Information Technology, 2012, 12(3): 115-121.]
[14] BURGGRAEVE S, VANSTEENWEGEN P. Robust routing and timetabling in complex railway stations[J]. Transportation Research Part B: Methodological, 2017, 101: 228-244. |