|
[1] LEEY,CHENCY.Aheuristicfor thetrainpathingand
timetablingproblem[J]. TransportationResearchPartB:
Methodological,2009,43(8):837-851.
[2] PETERINGMEH,HEYDARM, BERGMANNDR.
Mixed-integerprogrammingfor railwaycapacityanalysis
andcyclic, combined train timetabling andplatforming
[J].TransportationScience,2016,50(3):892-909.
[3]周妍.列车运行图与车站作业计划协同编制仿真分析[J].系统仿真学报,2018,30(10):3665-3670. [ZHOU
Y. Simulationanalyzing for drawingupmethodology of
cooperative trainworking diagramand route allocation
plan[J]. Journal of System Simulation, 2018, 30(10):
3665-3670.]
[4]高金科,滕靖,曲思源.协同能力目标和停站需求的高速铁路列车基本运行图优化[J].同济大学学报(自然科学版),2025,53(2):263-271. [GAOJK,TENGJ,QUS
Y. Optimization of basic train diagram forhigh-speed
railway based on coordination capacity target and
stoppingdemand[J]. JournalofTongjiUniversity(Nature
Science),2025,53(2):263-271.]
[5]安迪,武晋飞,张宇墨.高速铁路列车运行图一体化自动编制方法研究[J].铁道学报, 2024, 46(2): 12-21.
[AND,WUJ F, ZHANGYM. Integrated automatic
timetablingmethodforhigh-speedrailway[J]. Journalof
theChinaRailwaySociety,2024,46(2):12-21.]
[6]王劲.高速铁路列车运行图一体化编制问题的快速精细化研究[D].北京:北京交通大学,2020. [WANGJ.
High efficiency and high precision research on the
integration of high-speed railway train timetabling
problem[D].Beijing:BeijingJiaotongUniversity,2020.]
[7]高如虎,牛惠民,江雨星.基于多维网络的增开列车条件下高速铁路列车运行图调整[J].铁道学报,2020,42
(5): 1-8. [GAORH, NIUHM, JIANGYX. Train
timetable rescheduling based on a time-station-track
multi-dimensional network under condition of running
extra trains for high-speed railway[J]. Journal of the
China Railway Society, 2020, 42(5): 1-8.]
[8]廖正文.基于资源的铁路运输能力理论与计算方法[D]. 北京: 北京交通大学,2021. [LIAO Z W. Resource
based railway capacity theory and estimation method[D].
Beijing: Beijing Jiaotong University, 2021.]
[9]
张琴,朱晓宁,王力,等.高铁列车运行图和到发线分配的协同编制方法[J]. 北京交通大学学报,2021,45
(1): 16-22. [ZHANG Q, ZHU X N, WANG L, et al.
Integrated generation method of train timetabling and arrival-departure track allocation in high-speed railway
network[J]. Journal of Beijing Jiaotong University, 2021,
45(1): 16-22.]
[10] 田小鹏,牛惠民,韩瑛.面向需求的城际列车时刻表与停站方案同步优化[J]. 交通运输系统工程与信息,
2023, 23(2): 197-207. [TIAN X P, NIU H M, HAN Y.
Collaborative optimization of demand-oriented train
timetabling and stop planning for intercity railways[J].
Journal of Transportation Systems Engineering and
Information Technology, 2023, 23(2): 197-207.]
[11] 李得伟, 丁世顺,张琦,等.基于客流需求的城际列车时刻表模型改进研究[J].交通运输系统工程与信息,
2017, 17(3): 157-164. [LI D W, DING S S, ZHANG Q,
et al. Improved dynamic demand oriented timetabling
model for intercity railway[J]. Journal of Transportation
Systems Engineering and Information Technology, 2017,
17(3): 157-164.]
[12] 袁博, 李博, 郭一唯,等.面向多目标优化的高速铁路车站股道运用方案快速生成方法研究[J].铁道运输与经济, 2025, 47(12): 61-69. [YUAN B, LI B, GUO Y W,
et al. Rapid generation method of HSR station track
utilization scheme for multi-objective optimization[J].
Railway Transport and Economy, 2025, 47(12): 61-69.]
[13] 郭一唯,周文梁,张新.车底运用效率优先的高铁区域路网运行图自动编制方法[J].中国铁路,2025(3):126
132. [GUO Y W, ZHOU W L, ZHANG X. Method for
automatic preparation of train working diagrams for high
speed railway regional networks prioritizing trainset
utilization efficiency[J]. China Railway, 2025(3): 126
132.
|