|
[1]符卓,袁雪莹,车瑶.高速动车组司机乘务交路优化编制方法[J]. 铁道学报,2020, 42(7): 24-33. [FU Z, YUAN
X Y, CHE Y. Optimization method for high-speed
electric multiple unit crew scheduling[J]. Journal of the
China Railway Society, 2020, 42(7): 24-33.]
[2]曾娟.考虑固定区段轮乘制的高速铁路乘务计划研究[D]. 兰州: 兰州交通大学, 2024. [ZENG J. A study on
high-speed railway crew planning based on the fixed-
section pooling mode[D]. Lanzhou: Lanzhou Jiaotong
University, 2024.]
[3]王莹,刘军,苗建瑞.客运专线乘务交路计划编制的优化模型与算法[J]. 铁道学报, 2009, 31(1): 15-19.
[WANG Y, LIU J, MIAO J R. Modeling and solving the
crew scheduling problem of passenger dedicated line[J].
Journal of the China Railway Society, 2009, 31(1): 15-
19.]
[4]TAPKAN P, KULLUK S, ÖZBAKIR L, et al. A constraint
programming based column generation approach for crew
scheduling: A case study for the Kayseri railway[J].
Journal of the Operational Research Society, 2023, 74(9):
2028-2042.
[5]王媛媛,周成晨,倪少权.基于蚁群算法的客运专线乘务交路计划编制方法研究[J].铁路计算机应用,2009,
18(7): 11-14. [WANG Y Y, ZHOU C C, NI S Q. Study on
algorithm of crew routing scheduling for passenger
dedicated line based on ant colony optimization[J].
Railway Computer Application, 2009, 18(7): 11-14.]
[6]HANAFI R, KOZAN E. A hybrid constructive heuristic
and simulated annealing for railway crew scheduling[J].Computers & Industrial Engineering, 2014, 70: 11-19.
[7]杨嘉宝,符卓.带立即折返的高速动车组乘务交路回路优化编制方法[J].铁道科学与工程学报,2018,
15(11): 2738-2745. [YANG J B, FU Z. An optimization
method for high-speed motor train unit crew roundtrip
routing problem with immediate turn-back[J]. Journal of
Railway Science and Engineering, 2018, 15(11): 2738-
2745.]
[8]张哲铭,王莹,廖正文,等.基于时空状态网络的高速铁路乘务交路计划优化研究[J].铁道学报,2019,41
(9): 1-11. [ZHANG Z M, WANG Y, LIAO Z W, et al.
Research on optimization of crew scheduling of high-
speed railway based on time space state network[J].
Journal of the China Railway Society, 2019, 41(9): 1-11.]
[9]HANCZAR P, ZANDI A. A novel model and solution
algorithm to improve crew scheduling in railway
transportation: A real world case study[J]. Computers &
Industrial Engineering, 2021, 154: 107132.
[10] ROSSUM V B, DOLLEVOET T, HUISMAN D. Railway
crew planning with fairness over time[J]. European
Journal of Operational Research, 2024, 318 (1): 55-70.
[11] 王东先, 孟学雷,乔俊,等.基于改进蚁群算法的铁路乘务交路计划的编制[J]. 计算机应用, 2019, 39(9):2749-2756. [WANG D X, MENG X L, QIAO J, et al.
Railway crew routing plan based on improved ant colony
algorithm[J]. Journal of Computer Applications, 2019,
39(9): 2749-2756.]
[12] 林枫. 固定区段轮乘制乘务交路计划编制模型及算法[J]. 铁道学报, 2019, 41(12): 10-18. [LIN F. Bilevel
scale model and multi-objective multi-stage heuristic
algorithm for crew scheduling based on fixed-section
pooling mode[J]. Journal of the China Railway Society,
2019, 41(12): 10-18.]
[13] NEUFELD J S, SCHEFFLER M, TAMKE F, et al. An
efficient column generation approach for practical
railway crew scheduling with attendance rates[J].
European Journal of Operational Research, 2021, 293(3):
1113-1130.
[14] WANG Y, ZHANG Z, HUISMAN D, et al. A lagrangian
relaxation approach based on a time-space-state network
for railway crew scheduling[J]. Computers & Industrial
Engineering, 2022, 172: 108509.
[15] PANG S, CHEN M C. Optimize railway crew scheduling
by using modified bacterial foraging algorithm[J].
Computers & Industrial Engineering, 2023, 180: 109218.
|