[1] 徐杰, 杜文. 基于遗传算法的区段站到发线运用优化 安排[J]. 中国铁道科学, 2003,24(2): 109-114.[XU J, DU W. The genetic based algorithms optimization plan of using the arrival and departure track at railway sec? tional station[J]. China Railway Science, 2003, 24(2): 109-114.]
[2] 陈彦, 史峰. 旅客列车过站径路优化模型与算法[J]. 中国铁道科学, 2010, 31(2): 101-106. [CHEN Y, SHI F.Optimization model and algorithm for routing passenger trains through a railway station[J]. China Railway Science,2010, 31(2): 101-106.]
[3] 张英贵, 雷定猷. 铁路客运站股道运用窗时排序模型与算法[J]. 铁道学报, 2011,33(1): 1-7.[ZHANG Y G,LEI D Y. Due windows scheduling model and algorithm of track utilization in railway passenger stations[J]. Journal of the China Railway Society, 2011,33(1): 1-7.]
[4] 谢楚农, 黎新华. 铁路客运站到发线运用优化研究[J].中国铁道科学, 2004,25(5): 130-133.[XIE C N, LI X H. Optimization research for utilization of arrival and departure tracks in railroad passenger station[J]. China Railway Science, 2004,25(5): 130-133.]
[5] Malachy Carey, Sinead Carville. Scheduling and platforming trains at busy complex stations[J].Transportation Research Part A,2003,37:195-224.
[6] Partha Chakroborty, Durgesh Vikram. Optimum assignment of trains to platforms under partial schedule compliance[J]. Transportation Science,2008,42:169-184.
[7] Joaqu?'n Rodriguez. A constraint programming model for real-time trains scheduling at junctions[J]. Transportation Science 37:213-222.
[8] Richard Freling, Ramon M Lentink, Leo G Kroon, et al. Shunting of passenger train unitsin a railway station[J].Transportation Science,2005,39(2):261-272.
[9] Kibardin V M. Decomposition into functions in the minimization problem[J]. Automation and Remote Control,1980,40(8):1311-1323.
[10] Diaby M, Bahl H C, Karwan M H, et a1. A Lagrangean relaxation approach for very- large- scale capacitated lot-sizing[J]. Management Science, 1992,38(2): 1329-1340. |