[1] Rachel C W Wong, et al. Optimizing timetable synchronization for rail mass transit[J]. Transportation Science. 2008, 42(1): 57-69.
[2] 周艳芳, 周磊山, 乐逸祥. 城市轨道网络换乘站列车衔接同步协调优化研究[J]. 铁道学报. 2011, 33(3): 9-16.[ZHOU Y F, ZHOU L S, YUE Y X. Synchronized and coordinated train connection optimization for transfer stations of urban rail networks[J]. Journal of the China Railway Society. 2011, 33(3): 9-16.]
[3] 王菲,孙全欣,毛保华,等. 基于时刻表协调的同台换乘聚集人数计算模型[J]. 交通运输系统工程与信息. 2013, 13(3):163-169. [WANG F, SUN Q X, MAO B H, et al. Calculation model for passenger assembling on one-platform-transfer station based on timetable coordination[J]. Journal of Transportation Systems Engineering and Information Technology, 2013, 13(3): 163-169.]
[4] 王婵婵,刘加华,朱霞. 不同行车密度下轨道交通换乘站客流情况研究[J]. 城市轨道交通研究. 2011(6): 37- 39. [WANG C C, LIU J H, ZHU X. Passenger flow at rail transit station transfer in different rates of traffic flow[J]. Urban Mass Transit Research. 2011(6): 37-39.]
[5] 汪波,韩宝明,牛丰,等. 城市轨道交通网络运力优化配置研究[J]. 铁道学报. 2011, 33(12): 9-14. [WANG B, HAN B M, NIU F, et al. Study on optimization of transport capacity allocation for urban mass transit network[J]. Journal of the China Railway Society. 2011, 33(12): 9-14.]
[6] 赵宇刚,毛保华,杨远舟,等. 城市轨道交通站台最高聚集人数计算方法研究[J]. 交通运输系统工程与信息. 2011, 11(2):149~154. [ZHAO Y G, MAO B H, YANG Y Z, et al. Methods of calculating the maximum assembling on urban rail transit platforms[J]. Journal of Transportation Systems Engineering and Information Technology. 2011, 11(2):149-154.]
[7] 赵宇刚,毛保华,蒋玉坤. 基于列车运行时间偏离的地铁列车运行图缓冲时间研究[J]. 中国铁道科学,2011, 32(1): 118-121. [ZHAO Y G, MAO B H, JIANG Y K. Study on buffer time of metro train diagram based on train running time deviation[J]. China Railway Science, 2011,31(1):118-121.] |