[1] Drewry Maritime Research. Quarterly forecasts of the container market[R]. London, 2015.
[2] Price Waterhouse Coopers. The World in 2050: Will the shift in global economic power continue?[R]. UK, 2015.
[3] Vis I F A, de Koster R. Transshipment of containers at a container terminal: An overview[J]. European Journal of Operational Research, 2003, 147(1): 1-16.
[4] Steenken D, Voß S, Stahlbock R. Container terminal operation and operations research- a classification and literature review[J]. OR Spectrum, 2004, 26(1): 3-49.
[5] Stahlbock R, Voß S. Operations research at container terminals: a literature update[J]. OR Spectrum, 2008, 30 (1): 1-52.
[6] Kim K Y, Kim K H. Heuristic algorithms for routing yard- side equipment for minimizing loading times in container terminals[J]. Naval Research Logistics, 2003, 50(5): 498-514.
[7] He J L, Chang D F, Mi W J, et al. A hybrid parallel genetic algorithm for yard crane scheduling[J]. Transportation Research Part E: Logistics and Transportation Review, 2010, 46 (1): 136-155.
[8] Chang D F, Jiang Z H, Yan W, et al. Developing a dynamic rolling-horizon decision strategy for yard crane scheduling[J]. Adv. Eng. Inform, 2011, 25 (3) : 485-494.
[9] Yan W, Huang Y F, Chang D F, et al. An investigation into knowledge-based yard crane scheduling for container terminals[J]. Advanced Engineering Informatics, 2011, 25(3): 462-471.
[10] He J L, Huang Y F, Yan W. Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption[J]. Advanced Engineering Informatics, 2015, 29 (1): 59-75.
[11] He J L, Huang Y F, Yan W, et al. Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption[J]. Expert Systems with Applications, 2015, 42(5): 2464- 2487.
[12] 赵磊,胡志华,李淑琴. 基于作业均衡的集装箱堆场箱 区场桥作业调度[J]. 武汉理工大学学报, 2013, 35(1): 69- 74. [ZHAO L, HU Z H, LI S Q. Container yard crane scheduling for operations balance between yard cranes[J]. Journal of Wuhan University of Technology, 2013, 35(1): 69-74.]
[13] 郑红星, 于凯. 基于混合遗传算法的混堆箱区内场桥 调度研究[J]. 交通运输系统工程与信息, 2013, 13(5): 150-158. [ZHENG H X, YU K. Yard crane scheduling in the mixture storage block based on hybrid genetic algorithm[J]. Journal of Transportation Systems Engineering and Information Technology, 2013, 13(5): 150-158. ]
[14] Zhang C, Wan Y, Liu J, et al. Dynamic crane deployment in container storage yards[J]. Transportation Research Part B: Methodological, 2002, 36(6): 537-555.
[15] Cheung R K, Li C L, Lin W Q. Interblock crane deployment in container terminals[J]. Transportation Science, 2002, 36(1): 79-93.
[16] Linn R, Liu J, Wan Y, et al. Rubber tired gantry crane deployment for container yard operation[J]. Computers & Industrial Engineering, 2003, 45(3): 429-442.
[17] Cao Z, Lee D H, Meng Q. Deployment strategies of double-rail-mounted gantry crane systems for loading outbound containers in container terminals[J]. International Journal of Production Economics, 2008, 115(1): 221-228. |