[1] 中国国家铁路集团有限公司. 普速铁路线路修理规则 [M]. 北 京: 中 国 铁 道 出 版 社, 2019. [China State Railway Group Co., Ltd.. Rule on maintenance of rail track[M]. Beijing: China Railway Press, 2019.]
[2] ANDRADE A R, TEIXEIRA P F. Proceedings of the 13th world conference on transport research, 2013[C]. Brazil: Transportation Research Board, 2013.
[3] 曲建军, 高亮, 辛涛, 等. 基于改进灰色-马尔可夫链的轨道不平顺发展预测方法[J]. 北京交通大学学报, 2010, 34(4): 107-111. [QU J J, GAO L, XIN T, et al. Track irregularity development prediction method based on Grey- Markov Chain model[J]. Journal of Beijing Jiaotong University, 2010, 34(4): 107-111.]
[4] DAVIS R A, LEE T C M, RODRIGUEZ- YAM G A. Structural break estimation for nonstationary time series models[J]. Publications of the American Statistical Association, 2006, 101(473): 223-239.
[5] LU Q Q, LUND R, LEE T C M. An MDL approach to the climate segmentation problem[J]. Annals of Applied Statistics, 2010, 4(1): 299-319.
[6] JORMA R. Stochastic complexity in statistical inquiry theory[M]. Singapore: World Scientific, 1998.
[7] PENG X, SUN Q, LIU R, et al. Optimizing the alignment of inspection data from track geometry cars[J]. Computer-Aided Civil and Infrastructure Engineering, 2015, 30(1): 19-35. |