[1] 李开国. 特大城市机动车增长与分布特征研究[J]. 交通与运输, 2013, H12: 1-4. [LI K G. The growth and the distribution characteristics of motor vehicle in the mega-cities[J]. Traffic and Transportation, 2013, H12: 1-4.]
[2] Fhwa (Federal highway administration). Value pricing pilot programme[OL], (2014-10-27) [2014-12- 26]. http : // www . ops.fhwa. dot.gov / tolling_pricing / value_pricing/.
[3] Poole R W, Orski C K. HOT Networks: A new plan for congestion relief and better transit[R]. Los Angeles: Reason Public Policy Institute, 2003.
[4] 韩慧敏(译). 加利福尼亚州车辆合乘系统运行效果[J]. 城市交通, 2010, 8(4): 79-93. [HAN H M (translate). Effectiveness of california’s high occupancy vehicle (HOV) system[J]. UTC journal, 2010, 8(4): 79-93.]
[5] Fhwa (Federal highway administration). HOT lanes, cool facts[OL], (2013- 8- 2) [2014- 12- 26]. http:// www. ops. fhwa. dot. gov / publications / fhwahop 12031 /fhwahop12027/index.htm.
[6] Fhwa (Federal highway administration). Considerations for high occupancy vehicle (HOV) lane to high occupancy toll (HOT) lane conversions guidebook[R]. Washington DC: Federal Highway Administration, 2007.
[7] Small K A, Yan J. The value of "Value Pricing" of roads second- best pricing and product differentiation[J]. Journal of Urban Economics, 2001, 49: 310-336.
[8] Lou Y, Yin Y, Laval J A. Optimal dynamic pricing strategies for high-occupancy/toll lanes[J]. Transportation Research Part C, 2011, 19: 64-74.
[9] Burris M W, Ungemah D H, Mahlawat M, et al. Investigating the impact of tolls on high-occupancyvehicle lanes using managed lanes[J]. Transportation Research Record, 2009, 2099: 113-122.
[10] Light T. High occupancy toll lane performance under alternative pricing policies[J]. Journal of The Transportation Research Forum, 2012, 51(2): 61-82.
[11] Michalaka D, Yin Y, Hale D. Simulating highoccupancy toll lane operations[J]. Transportation Research Record, 2013, 2396: 124-132.
[12] Brownstone D, Small K A. Valuing time and reliability: assessing the evidence from road pricing demonstrations[J]. Transportation Research Part A, 2005, 39(4): 279-293.
[13] Lam T C, Small K A. The value of time and reliability: measurement from a value pricing experiment[J]. Transportation Research Part E, 2001, 37(2- 3), 231- 251.
[14] Fhwa (Federal highway administration). Predicting high occupancy vehicle lane demand[R], (1996-6-1) [2014- 12-26]. http://ntl.bts.gov/lib/jpodocs/repts_te/3823.pdf.
[15] Fan W, Khan M B, Ma J, et al. Bi-level programming model for locating park-and-ride facilities[J]. Journal of Urban Planning and Development, 2014, 140(3): 04014007.
[16] Vtpi (Victoria transport policy institute). Transportation cost and benefit analysis[R], (2013-8-28) [2014-12- 26]. http://www.vtpi.org/tca/tca0504.pdf. |