[1] 董建民. 双层集装箱运输——铁路集装箱运输发展的 里程碑[J].铁道货运,2004(5):8-11. [DONG J M. Double-deck container transportation: milestone of the railway container development[J]. Railway Freight Transportation, 2004 (5): 8-11.]
[2] 姚凤金,杨浩. 基于多目标的双层集装箱配载研究[J].物流技术,2006,3(3):87-90. [YAO F J, YANG H. Study on matching of multi-object-based double-layer container[J]. Logistics Technology, 2006, 3(3): 87-90.]
[3] 赵鹏,杨浩,姚凤金. 双层集装箱运输车辆的配载算法[J]. 北京交通大学学报,2005,29(3):81-83. [ZHAO P, YANG H, YAO F J. An algorithm for doublecontainer vehicle matching[J]. Journal of Beijing Jiaotong University, 2005, 29(3): 81-83.]
[4] Jahren C T, Rolle S S. A computerized assignment algorithm for loading intermodal containers to doublestack rail cars[R]. Contaner Traffic, 1994.
[5] Pacanovsky D L, Jahren C T,Palmer R N, et al. A decision support system to load containers to doublestack rail cars[J]. Civil Engineering Systems, 1995, 11(4): 247-261.
[6] Jahren C T, Rolle S S, Spurgeon L E, et al. Automatic assignment algorithms for loading double-stack railcars[J]. Transportation research record, 1995 (1511):10-18. |