[1] CLARK S, WATLING D. Modelling network travel time reliability under stochastic demand[J]. Transportation Research Part B: Methodological, 2005, 39(2): 119-140.
[2] LAM W H K, XU G. A traffic flow simulator for network reliability assessment[J]. Journal of Advanced Transportation, 1999, 33(2): 159-182.
[3] CHEN A, YANG H, LO H K, et al. Capacity reliability of a road network: An assessment methodology and numerical results[J]. Transportation Research Part B: Methodological, 2002, 36(3): 225-252.
[4] IIDA Y, WAKABAYASHI H. An approximation method of terminal reliability of road network using partial minimal path and cut sets[C]// Transport Policy, Management & Technology Towards 2001: Selected Proceedings of the Fifth World Conference on Transport Research. 1989.
[5] 李志纯, 朱道立. 随机动态交通网络可靠度分析与评价[J]. 交通运输工程学报, 2008, 8(l): 106-112. [LI Z C, ZHU D L. Analysis and evaluation of reliability for stochastic and dynamic transport network[J]. Journal of Traffic and Transportation Engineering, 2008, 8(l): 106- 112.
[6] 张勇, 白玉, 杨晓光. 城市道路网络的行程时间可靠性[J]. 系统工程理论与实践, 2009, 29(8): 171-176. [ZHANG Y, BAI Y, YANG X G. Travel time reliability in urban arterial networks[J]. System Engineering- Theory and Practice, 2009, 29(8): 171-176.]
[7] 张玺, 刘海旭, 蒲云. 基于随机失效序列的日变路网动态可靠性[J]. 系统工程理论与实践, 2013, 33(8): 2105- 2109. [ZHANG X, LIU H X, PU Y. Stochastic failure sequences based dynamic reliability in a day-today road network[J]. System Engineering- Theory and Practice, 2013, 33(8): 2105-2109.]
[8] MAIO M L D, VITETTA A, WATLING D. Influence of experience on users’behavior: A day-to-day model for route choice updating[J]. Procedia-Social and Behavioral Sciences, 2013, 87(10): 60-74.
[9] PARRY K, HAZELTON M L. Bayesian inference for day- to- day dynamic traffic models[J]. Transportation Research Part B, 2013, 50 (1): 104-115.
[10] 刘诗序, 关宏志. 出行者有限理性下的逐日路径选择行为和网络交通流演化[J]. 土木工程学报, 2013, 46 (12): 136-144. [LIU S X, GUAN H Z. Travelers’dayto- day route-choice behavior and evolution of network traffic flow based on bounded rationality[J]. China Civil Engineering Journal, 2013, 46(12): 136-144.]
[11] KAHNEMAN D, TVERSKY A. Prospect theory: An analysis of decision under risk[J]. Econometrica, 1979, 47 (2): 263-292.
[12] PRELEC D. The probability weighting function[J]. Econometrica, 1998, 66(3): 497 - 527.
[13] SMITH M, HAZELTON M L, LO H K, et al. The long term behaviour of day-to-day traffic assignment models[J]. Transport Science, 2014, 10(7): 647-660. |