[1]王义军,赵贞. 压缩到达列车等待列检时间的探讨[J]. 铁道运输与经济, 2007, 29(9):5-6. [WANG Y J, ZHAO Z. Exploration on shortening the inspection waiting time for arrival trains[J]. Railway Transport and Economy, 2007, 29(9):5-6.][2]易昆南,李丹,何健. 基于图论的列检工作安排模型[J]. 数学理论与应用, 2008, 28(4):23-27. [YI K N, LI D, HE J. The model of train inspection work arrangement based on graph theory[J]. Mathematical Theory and Applications. 2008, 28(4):23-27.][3]鞠洪钦. 开行重载列车沿线编组站到解系统作业效率指标及接车延误率计算[J]. 中国铁道科学, 1997, 18(3):93-102. [JU H Q. Calculating the receiving delaying possibility and efficiency indicators of arriving-breaking up system of marshalling yards for the operation of heavy haul trains[J]. China Railway Science, 1997, 18(3):93-102.][4]薛峰,王慈光,罗建,等. 编组站列车解体方案与编组方案的协调优化研究[J]. 铁道学报, 2008, 30(2):1-6. [XUE F, WANG C G, LUO J, et al. Study on coordination optimization of train sorting and classifying schemes in marshalling station[J]. Journal of the China Railway Society, 2008, 30(2):1-6][5]孙琦,周磊山,乐毅祥,等. 编组站到解系统匹配与协调关系动态仿真分析[J]. 系统仿真学报, 2007, 19(15):3595-3598. [SUN Q, ZHOU L S, YUE Y X, et al. Dynamic simulation analyzing for matching and coordinating relationship of declassification system in marshalling station[J], Journal of System Simulation, 2007, 19(15):3595-3598.][6]朱晓立,李夏苗. 提速干线编组站出发子系统内部匹配与协调关系[J]. 中国铁道科学, 2006, 27(5):118-121. [ZHU X L, LI X M. The matching and coordinating relationship of the departure subsystem in marshalling station on trunk line with increased speed[J]. China Railway Science, 2006, 27(5):118-121.][7]张志涛,崔炳谋,瞿成俊. 提高编组站解体作业效率的探讨[J]. 交通标准化, 2010, (1) :130-133. [ZHANG Z T, CUI B M, QU C J. Heightening efficiency of break-up operation in marshalling station[J]. Traffic Standardization, 2010, (1):130-133.][8]陈 刚,张殿业,张 成,等. 编组站解体能力影响因素的仿真技术研究[J]. 中国铁道科学, 2006, 27(2):126-131. [CHEN G, ZHANG D Y, ZHANG C,et al. Research on the simulation technology for the breaking up capacity of marshalling station[J]. China Railway Science, 2006, 27(2):126-131.][9]孔庆铃,刘其斌. 铁路运输能力计算与加强[M]. 中国铁道出版社, 2006. [10]胡思继. 列车运行图编制理论[M]. 中国铁道出版社, 2007. [11]谭立刚,杨肇夏. 编组站模拟系统中到达流生成的方法[J]. 北方交通大学学报, 1998, 22(6):43-47. [TAN L G, YANG Z X. Method of creating the received wagon flow for the computer simulation in marshalling station[J]. Journal of Northern Jiaotong University, 1998, 22(6):43-47.] |