[1] 卓曦,张宁,钱振东. 大型公建对向机动车出入口间距计算及优选[J]. 交通运输工程学报,2010,10(4): 71- 78. [ZHUO X,ZHANG N,QIAN Z D. Spacing calculation and selection on opposite vehicle access of large public building[J]. Journal of Traffic and Transportation Engineering,2010,10(4): 71-78.]
[2] Gluck J, Levinson H S, Stover V. Impacts of access management techniques(NCHRP Report 420) [R]. Washington, DC: National Academy Press, 1999.
[3] Jerome S G, Greg H, Jamal M. Driveway spacing and traffic operations[C]// TRB, eds. Proceedings of the Urban Street Symposium. Washington, DC: Transportation Research Board, 2000.
[4] Gattis J L, Gluck J S, Barlow J M, et al. Guide for the geometric design of driveways[R]. Washington, DC: Transportation Research Board, 2010.
[5] 卓曦,钱振东,张宁. 大型公共建筑同向机动车出入口间距计算[J]. 东南大学学报(自然科学版), 2012,42(3): 560-564. [ZHUO X,QIAN Z D,ZHANG N. Spacing calculation for same-side vehicle access of large public building[J]. Journal of Southeast University ( Natural Science Edition),2012,42(3): 560-564.]
[6] 沈家军, 王炜. 基于摄影测量原理的道路交叉口机非冲突区域界定[J]. 扬州大学学报, 2010, 13(1): 75- 78. [SHEN J J, WANG W. Study on the motor and nonmotor mixed traffic conflict zone of urban intersections based on photogrammetry[J]. Journal of Yangzhou University (Natural Science Edition) , 2010, 13(1): 75- 78.] |