[1] Mellit B, Coodman C J, Arthurton R I M. Simulator for studying operational and power supply conditions in rapid-transit railways [J].P roc.IEE, 1978, 125(4):298-303. [2] Mefitt B, Goodman C J. Arthurton R I M. Simulation studies of energy saving with chopper control on the jubilee line [J] .Proc.IEE, 1978, 125(4):304-310. [3] He T J, Mao B H, Yuan Z Z, Yang Z Z, A general-purpose simulation for train operations[C]// Proceedings of ICTTS’98, ASCE, 1998:830-839. [4] Jia W Z, Mao B H, Liu H D, et al. Service robustness analysis of trains by a simulation method [C]// Baohua Mao, Zongzhong Tian, Haijun Huang and Ziyou Gao. Proceedings of the Sixth International Conference on Traffic and Transportation Studies, ASCE, USA, 2008, 752-762. [5] Hooghiemstra J S, Teunisse M J G T. The use of simulation in the planning of the Dutch railway service [C]//Proceedings of the 1998 Winter Simulation Conference,1998:1139-1145. [6]Rizzoli A E., Fornara N, Gambardella L M. A simulation tool for combined rail/road transport in intermodal terminals[J]. Mathematics and Computers in Simulation, 2002(59): 57–71. [7] Fateh K, Said H, Abdellah E M . A hybrid petri nets-based simulation model for evaluating the design of railway transit stations[J].Simulation Modeling Practice and Theory, 2007,15: 935-969. [8]杨肇夏, 李菊, 孙晚华,等.铁路编组站技术作业模拟系统的研究[J].铁道学报,1996,18(增刊):25-32. [Yang Zhao-xia, Li Ju, Sun Wan-hua,et al. Studies on technical operation simulation system in railway marshalling stations[J], Journal Of China Railway Society, 1996, S1:25-32] [9]HE T K, MAO B H, YANG Z .A multi-train movement simulator with moving block signalling [C]// Proceedings of 6th International Conference on Computer Aided Design, Manufacture and Operation in the Railway and Other Advanced Mass Transit System,WIT Press, 1998: 783-792. [10]毛保华, 何天健, 袁振洲,等. 通用列车运行模拟系统研究[J], 铁道学报,2000,22 (l):1-10. [Mao B H, He T K ,Yuan Z Z, et al. A general-purposed simulation system on train movement[J]. Journal of the China railway society. 2000.22 (1), 1-10.] [11] HE T J, MAO B H, YUAN Z Z, ed al. Computer simulation and modeling in railway applications[J]. Computer Physics Communications, 2002, 143:1-10. [12] 刘剑锋, 丁勇, 刘海冬, 程文毅, 毛保华, 何天健,城市轨道交通多列车运行模拟系统研究[J],交通运输系统工程与信息,2005,5(1):79-82 .[LIU Jian-feng, DING Yong, LIU Hai-dong, CHENG Wen-yi, MAO Bao-hua, HE Tian-jian, Multi-train movement simulation system for urban rail transit[J], Journal of Transportation Systems Engineering and Information Technology, 2005,5(1):79-82] [13] 徐瑞华,江志彬,邵伟中,朱效洁.城市轨道交通列车运行延误及其传播特点的模拟研究[J].铁道学报,2006,28(2):7-10. [XU Rui-hua,JIANG Zhi-bin,SHAO Wei-zhong, ZHU Xiao-jie, Simulation study on train delay and propagation characteristics of urban mass transit systems[J], Journal of China Railway Society, 2006,28(2):7-10] [14] Mao B H, Liu J F, Ding Y, Liu H D, He T J., Signalling layout for fixed-block railway lines with real-coded genetic algorithms[J]. Transaction of Hong Kong Institution of Engineers. 2006,3(1):1-6. [15] 杨肇夏,毛保华,何天健.铁路运输模拟系统的现状与发展[J].北方交通大学学报, 2002, 26 (5): 1-8. [YANG Zhao-xia, MAO Bao-hua HE Tian-jian, Sitution and development of railway transportation system simulators[J], Journal of Nothern Jiaotong University, 2002, 26(5):1-8] [16] 中华人民共和国铁道行业标准, 列车牵引计算规程[S], 北京:中国铁道出版社,1998. [Professional Standard of People’s Republic of China, Train Traction Calculation Regulations[S], Beijing:China Railway Publishing House 1998.] |