[1]Ruotoistenmki A,Seppälä T.Road condition rating based on factor analysis of road condition measurements [J].Transport Policy,2007,14(5):410-420.[2]Fwa T F,Cheu R L,Muntasir A.Scheduling of pavement maintenance to minimize traffic delays[J].Transportation Research Record,1998,1650:28-35. [3]Cook W D. Distancebased and ad hoc consensus models in ordinal preference ranking [J]. European Journal of Operational Research, 2006, 172(2):369-385.[4]Pantha B R, Yatabe R, Bhandary N P. GISbased highway maintenance prioritization model: an integrated approach for highway maintenance in Nepal mountains [J]. Journal of Transport Geography, 2010, 18(3): 426-433 [5]Chan W T, Fwa T F, Hoque K Z. Constraint handling methods in pavement maintenance programming [J]. Transportation Research Part C: Emerging Technologies, 2001,9(3): 175-190.[6]Garza J M, Akyildiz S, Bish D R. Networklevel optimization of pavement maintenance renewal strategies [J], Advanced Engineering Informatics, 2011,25 (4): 699-712. [7]Lee H Y. Optimizing schedule for improving the traffic impact of work zone on roads [J], Automation in Construction, 2009, 18(8):1034-1044. [8]Lentzakis A F, Spiliopoulou A D, Papamichail I,et al. Realtime work zone management for throughput maximization[C]. Proceedings of the 87th Annual Meeting of the Transportation Research Board,2008. [9]杨庆祥, 靳文舟, 杨亚璪,等. 城市管道工程施工期间交通组织研究[J]. 交通运输系统工程与信息, 2006,6(6): 153-157 [YANG Q X, JIN W Z, YANG Y Z, et al. Research on the traffic organization of municipal pipeline engineering in construction period [J]. Journal of Transportation Systems Engineering and Information Technology, 2006, 6(6): 153-157.][10]于英, 陈禹至, 刘媛媛. 高速公路施工区交通安全控制方法的研究[J]. 合肥工业大学学报(自然科学版), 2011,34(3):331-335.[YU Y, CHEN Y Z, LIU Y Y. Study of traffic safety control method for highway maintenance work zones [J]. Journal of Hefei University of Technology (Natural Science), 2011, 34(3): 331-335.][11]王燕, 孙曲辉. 地铁施工期间道路交通组织与管理方法探讨[J]. 交通标准化, 2007(8):23-26.[WANG Y, SUN Q H. Traffic organization and management during subway construction [J]. Communications Standardization(2007), 8: 23-26.][12]毛慧,谢志明.大城市地铁施工期间道路交通组织的方法探讨[J].重庆交通学院学报,2001,20(2),54-57.[MAO H, XIE Z M. Method discussion of transport organization during the period of the construction of metro in metropolis [J]. Journal of Chongqing Jiaotong University,2001, 20(2): 54-57.][13]Quadstone. PARAMICS modeller V6.5 user guide and reference manual [G]. Quadstone Ltd, Edinburgh, United Kingdom, 2009. |