[1]徐良杰,李兆康,王淑琴.城市铁路客运站交通衔接评价方法与模型[J].武汉理工大学学报,2008(8):105-108.[XU L J,LI Z K,WANG S Q.Evaluation mehod and model of traffic connection of urban railway passenger station [J].Journal of Wuhan University of Technology,2008(8):105-108.]
[2]郭峰.城市综合交通枢纽的衔接换乘研究[D].华中科技大学硕士论文,2004.[GUO F.Study on connection transfer of urban integrated transportation junction [D]. Huangzhong University of Science and Technology, 2004.]
[3]覃煜,晏克非.轨道交通与常规公交衔接系统分析[J].城市轨道交通研究,2000(2):44-48. [QIN Y, YAN K F.System analysis of connection of rail transit and normal bus transit [J].Urban Mass Transit, 2000(2):44-48.]
[4]Francois Batisse.Development of light rail traffic abroad with the use of railway [J].Transportation Research Record,2003:47-50.
[5]Louis Sato, Philippe Essig. How Tokyo’S subway inspired the pads RER [J].Japan Railway@Transport Review,2000:3-6.
[6]Anderison U W, CooPer D, Lueksart.DEA evaluations of performance audit[J].Intemal Auditing.1994,Vol.10,(Fall):12-22.
[7]谢美全,毛保华,等. 多交路动车组周转模型研究[J].交通运输系统工程与信息,2010, 10(3):50-57.[XIE M Q,MAO B H, et al.Modeling circulation of trainset with multiple routing [J]. Journal of Transportation Systems Engineering and Informaiton Techmology,2010,10(3):50-57.]
[8]徐洪敏.城市轨道交通运用车设计计算方法[J].铁道标准设计,2003(9):75-76.[XU H M.Calculation method of design of rolling stock utilization of urban rail transit[J]. Railway Standard Design,2003(9):75-76. ] |